Jie Tan

Jie Tan

Auto-generated profile, based on publicly available information

Jie Tan

School of Management, Shenzhen Polytechnic University, China

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
16 November 2023 in SIMULATION
Verified
Journal Article
Closed access
YZYue Zhang
Yue Zhang
JTJie Tan
Jie Tan
The development and popularization of new energy vehicles have become a global consensus. The shortage and unreasonable layout of electric vehicle charging infrastructure (EVCI) have severely restricted the development of electric vehicles. In the literature, many methods can be used to optimize the layout of charging stations (CSs) for producing good layout designs. However, more realistic evaluation and validation should be used to assess and validate these layout options. This study suggested an agent-based simulation (ABS) model to evaluate the layout designs of EVCI and simulate the driving and charging behaviors of electric taxis (ETs). In the case study of Shenzhen, China, geographical positioning system (GPS) trajectory data were used to extract the temporal and spatial patterns of ETs, which were then used to calibrate and validate the actions of ETs in the simulation. The ABS model was developed in a geographic information system (GIS) context of an urban road network with traveling speeds of 24 h to account for the effects of traffic conditions. After the high-resolution simulation, evaluation results of the performance of EVCI and the behaviors of ETs can be provided in detail and in summary. Sensitivity analysis demonstrates the accuracy of simulation implementation and aids in understanding the effect of model parameters on system performance. Maximizing the time satisfaction of ET users and reducing the workload variance of EVCI were the two goals of a multiobjective layout optimization technique based on the Pareto frontier. The location plans for the new CS based on Pareto analysis can significantly enhance both metrics through simulation evaluation.

1 January 2022 in Complexity
Verified
Journal Article
Open access
PDF file
JTJie Tan
Jie Tan
QZQin Zhong
Qin Zhong
Improving the reliability of electricity supply is closely related to the national industrial economy and people’s livelihood. When procuring electricity, the large consumer faces the risk of insufficient electricity supply. Such insufficiency may be caused by the supply disruption of the upstream electricity generator and the fluctuation of electricity prices in the electricity pool. We establish an expected cost model for the large consumer and a revenue model for the electricity generator by introducing robustness and opportunity functions to analyse the impact of supply disruption and price fluctuation on both members. Then, we obtain the optimal reliability level and subsidy rate. Our analytical results reveal the following points: (1) During an electricity price fluctuation, the sufficient and necessary condition for the large consumer to expect high robustness of his own decision‐making is to pay a high cost. (2) The high uncertainty of electricity price leads to less revenue for the electricity generator; thus, the electricity generator should perform well in price forecasting. (3) Without disruption risk, the electricity generator is reliable. Furthermore, the electricity pool is unreliable from the perspective of price. However, the electricity supply of the electricity generator is no longer reliable when considering disruption risk, whereas the electricity pool is reliable because the large consumer is tolerant of price fluctuation under this circumstance. Moreover, the impacts of market uncertainty and players’ attributes on the optimal strategies are explored.