Resource constraint project scheduling problem under stochastic circumstances have been considered in recent decades where uncertainty is modeled by means of activities' duration. In this paper we study an extension of basic stochastic RCPSP in which uncertainty come to play on resource availabilities. We have also pursued preempt-resume mode in case of activities breakdown due to resource infeasibility. A solution for this variant of RCPSP is defined in two steps by utilizing heuristic procedures for creating initial schedule and adding time and resource buffers in order to yields proactive schedule to cope with adverse effects of uncertainties. Numerical results revealed that proposed procedure yields significant performance gains over the ignorance of proactive strategies.
This paper deals with the cell formation problem that is the first step in designing cellular manufacturing system (CMS). The previous methods that were based on the array-based clustering for solving the cell formation problem have used the part-machine incidence matrix (PMIM) which was indicated the set of machines for processing each part. The main problem of these methods is the grouping parts and machines regardless of production volume, operational sequences, production cost, inventory and other production system's limitations. In this paper we intend to implement the multiple attribute decision making (MADM) concepts for covering the cause of drawback in the previous array-based clustering methods by considering two definitions of the arrays in PMIM. Four methods are presented that two methods are related to the binary arrays in PMIM and other two methods are considered the operational time as well as the operational sequencing in the definition of the arrays in PMIM. The results of the presented methods that are compared with a well-known approach are also reported.