S. B. Aliev

S. B. Aliev

Auto-generated profile, based on publicly available information

S. B. Aliev

Институт проблем комплексного освоения недр им. академика Н.В. Мельникова РАН

Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
17 April 2017 in Gornyi Zhurnal
Verified
Journal Article
Closed access
KYKh. A. Yusupov
Kh. A. Yusupov
EEE. A. Elzhanov
E. A. Elzhanov
SAS. B. Aliev
S. B. Aliev
MCMoscow Euroasian Economic Commission
Moscow Euroasian Economic Commission
DDD. A. Dzhakupov
D. A. Dzhakupov
AUAstana Semyzbay U
Astana Semyzbay U
The major requirement imposed on the method of underground leaching of uranium is continuous service of wells (from 1–2 to 3–5 years) at the preserved production output (well yield). At the same time, one of the main causes of well yield reduction in underground uranium leaching is mud fill of filters and near-filter zones in water-bearing strata, which induces increased flow friction and reduces infl ow of pregnant solution in wells. In this article, the authors are focused on the recovery of flow rate in pumping-out wells by means of efficient methods aimed to prevent colmatage in terms of Semyzbay deposit development in Kazakhstan. Operation of wells shows that the primary problem is chemical colmatage due to high content of silicium compounds in rocks. The standard approaches (swabbing, airlift pumping with compressed air, etc.) aimed at the flow rate enhancement have had no weighty result. The success has been only achieved with the studies into the mud fill prevention using ammonium bifluoride. The tested method consists in filling dry ammonium fluoride in a pumping well and then addition of sulfuric acid solution in it. As a result of the chemical reaction, fluohydric acid is generated in the nearfilter zone of a well and dissolves hardly soluble compounds of silicium, which diminishes colmatage of filters.The authors appreciate participation of M. B. Salkynbaev, Director, Semyzbay U, in this study.

8 November 2018 in Ugol'
Verified
Journal Article
Closed access
SAS.B. Aliev
S.B. Aliev
BSB.D. Suleev
B.D. Suleev
?????? ?????, ???????? ??????????????, ???????? ???????, ????? ?????? ???????? ???????, ????? ?????? ???????? ??????????????, ??????, ??????, ??????, ?????? ???????, ?????? ?????????, ?????? ??????, ?????? ????????, ??????? ??????? ????, ??????????? ???????? ??????????????, ????????-??????????????, ????????? ??????, ???????? ??????, ??????? ?????????, ??????? ?????????????, ?????? ?????, ???????????? ????????????, ????????????????, ?????????, ????? ????, ??????????? ????, ???????? ????, ????????

8 July 2019 in Ugol'
Verified
Journal Article
Closed access
MIM.K. Ibatov
M.K. Ibatov
SAS.B. Aliev
S.B. Aliev
OBO.T. Balabayev
O.T. Balabayev
BAB.Sh. Askarov
B.Sh. Askarov
?????? ?????, ???????? ??????????????, ???????? ???????, ????? ?????? ???????? ???????, ????? ?????? ???????? ??????????????, ??????, ??????, ??????, ?????? ???????, ?????? ?????????, ?????? ??????, ?????? ????????, ??????? ??????? ????, ??????????? ???????? ??????????????, ????????-??????????????, ????????? ??????, ???????? ??????, ??????? ?????????, ??????? ?????????????, ?????? ?????, ???????????? ????????????, ????????????????, ?????????, ????? ????, ??????????? ????, ???????? ????, ????????

25 June 2021 in Kompleksnoe Ispolzovanie Mineralnogo Syra = Complex Use of Mineral Resources
Verified
Journal Article
Closed access
RSResearch Institute of Comprehensive Exploitation of Mineral Resources Russian Academy of Sciences
Research Institute of Comprehensive Exploitation of Mineral Resources Russian Academy of Sciences
SAS. Aliev
S. Aliev
YOY. Omarbekov
Y. Omarbekov
SUSatbayev University
Satbayev University
This paper presents the results of experimental research applications "pumping wells" when the mining of uranium deposits by the method of In-Situ Leach Mining ISL in mine "Karatau". Analyzed the experience results of uranium deposits development in the conditions of high-pressure nature of groundwater. The experimental works have been conducted using proposed “pumping wells” technology. The implementation of the proposed "pumping well" technology did not affect the Me and pH values in comparison with the actual technology, but it did reduce the production cost. It is proved that by using the proposed technology and schemes in conditions of high-pressure nature of groundwater reduces the cost of procurement of cables, significantly reducing the cost of acquisition of submersible pumps, savings in the end cap.

8 January 2019 in Ugol'
Verified
Journal Article
Closed access
OSO.V. Starostina
O.V. Starostina
VDV.N. Dolgonosov
V.N. Dolgonosov
SAS.B. Aliev
S.B. Aliev
EAE.V. Abueva
E.V. Abueva

8 June 2020 in Ugol'
Verified
Journal Article
Closed access
SAS.B. Aliev
S.B. Aliev
VPVassiliy Portnov
Vassiliy Portnov
RAR.K. Atygaev
R.K. Atygaev
EFE.N. Filimonov
E.N. Filimonov
SIS.B. Imanbaeva
S.B. Imanbaeva
TJTemirtau “ArcelorMittal Temirtau” JSC
Temirtau “ArcelorMittal Temirtau” JSC