29 August 2017 in IEEE Transactions on Power Systems
Higher levels of renewable electricity generation increase uncertainty in power system operation. To ensure secure system operation, new tools that account for this uncertainty are required. In this paper, we adopt a chance-constrained AC optimal power flow formulation, which guarantees that generation, power flows and voltages remain within their bounds with a pre-defined probability. We then discuss different chance-constraint reformulations and solution approaches for the problem. We first discuss an analytical reformulation based on partial linearization, which enables us to obtain a tractable representation of the optimization problem. We then provide an efficient algorithm based on an iterative solution scheme which alternates between solving a deterministic AC OPF problem and assessing the impact of uncertainty. This more flexible computational framework enables not only scalable implementations, but also alternative chance-constraint reformulations. In particular, we suggest two sample based reformulations that do not require any approximation or relaxation of the AC power flow equations.
23 October 2014 in IEEE Transactions on Power Systems
With a large-scale introduction of plug-in electric vehicles (PEVs), a new entity, the PEV fleet aggregator, is expected to be responsible for managing the charging of, and for purchasing electricity for, the vehicles. We approach the problem of an aggregator bidding into the day-ahead electricity market with the objective of minimizing charging costs while satisfying the PEVs' flexible demand. The aggregator places demand bids only (no vehicle-to-grid is considered). The aggregator is assumed to potentially influence market prices, in contrast to what is commonly found in the literature. Specifically, the bidding strategy of the aggregator is formulated as a bilevel problem, which is implemented as a mixed-integer linear program. The upper level problem represents the charging cost minimization of the aggregator, whereas the lower level problem represents the market clearing. Since the bids of other market participants are not known to the aggregator ex ante, a simple strategy is used to estimate them, based on historical data. An aggregated representation of the PEV end-use requirements as a virtual battery, with time varying power and energy constraints, is proposed, derived from individual driving patterns. Since driving patterns cannot be perfectly forecasted, we introduce a probabilistic virtual battery model. We compare the results of the proposed bidding strategy with those of a bidding strategy assuming exogenous prices, uncontrolled charging, and a central dispatch of the fleet. We also explore the impacts of different sources of uncertainty. Results show that with the proposed bidding strategy, costs are significantly lower than under inflexible charging and are lower than assuming exogenous prices. Moreover, the approach also performs well under uncertainty. Results also suggest that the aggregator only has limited market power potential at moderate PEV penetrations.
29 July 2020 in Proceedings of the IEEE
In many parts of the world, electric power systems have seen a significant shift toward generation from renewable energy and natural gas. Because of their ability to flexibly adjust power generation in real time, gas-fired power plants are frequently seen as the perfect partner for variable renewable generation. However, this reliance on gas generation increases interdependence and propagates uncertainty between power grids and gas pipelines and brings coordination and uncertainty management challenges. To address these issues, we propose an uncertainty management framework for uncertain, but bounded gas consumption by gas-fired power plants. The admissible ranges are computed based on a joint optimization problem for the combined gas and electricity networks, which involves chance-constrained scheduling for the electric grid and a novel robust optimization formulation for the natural-gas network. This formulation ensures feasibility of the integrated system with a high probability, while providing a tractable numerical formulation. A key advance with respect to existing methods is that our method is based on a physically accurate, validated model for transient gas pipeline flows. Our case study benchmarks our proposed formulation against methods that ignore how reserve activation impacts the fuel use of gas power plants and only consider predetermined gas consumption. The results demonstrate the importance of considering uncertainty to avoid operating constraint violations and curtailment of gas to the generators.