Ralph Barone

Ralph Barone

Auto-generated profile, based on publicly available information

Ralph Barone

BC Hydro, Burnaby, Canada

Research Focus & Metrics

Academic Career Length

36Years (1991-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
28 September 2015 in IEEE Transactions on Power Delivery
Verified
Journal Article
Closed access
MNMukesh Nagpal
Mukesh Nagpal
SMSka-Hiish Manuel
Ska-Hiish Manuel
BBBryan E. Bell
Bryan E. Bell
RBRalph P. Barone
Ralph P. Barone
CHCharles Henville
Charles Henville
DGDevinder Ghangass
Devinder Ghangass
Single-phase trip and high-speed reclose (SPTR) schemes applied on extra-high-voltage (EHV) lines offer significant benefits over three-phase schemes as they help maintain synchronism and stability in sparse transmission networks. However, a secondary arc may persist and prevent timely recovery of the air insulation. In this situation, high-speed reclosing will attempt to re-energize the still-faulted line, adding stress to the system instead of benefiting the system from the SPTR scheme. Using staged fault and fault disturbance data recorded from several 500 kV lines, this paper presents validation of an enhanced hybrid scheme incorporating secondary arc extinction detection logic designed to avoid high-speed reclosing onto faults while also allowing single-phase reclose in cases where it would be successful. The new logic is now being applied to several 500 kV lines in BC Hydro to improve transmission system reliability.

28 November 2018 in IEEE Transactions on Power Delivery
Verified
Journal Article
Closed access
MNMukesh Nagpal
Mukesh Nagpal
RBRalph P. Barone
Ralph P. Barone
TMTerrence G. Martinich
Terrence G. Martinich
ZJZhixian Jiao
Zhixian Jiao
SMSka-Hiish Manuel
Ska-Hiish Manuel
SMSteve Merriman
Steve Merriman

1 January 1991
Verified
Conference Paper
Closed access
GNG. Neily
G. Neily
RBR. Barone
R. Barone
GJG. Josin
G. Josin
DCD. Charney
D. Charney
Artificial neural network software has been trained to perform the joint VAr control function and demonstrated on three large synchronous condensers. Training rate depends on the nature of the training data set. It is noted that training data sets should be designed to place the majority of the data in the areas where the transfer function is the most critical.<>

1 November 2013
Verified
Conference Paper
Closed access
MNMukesh Nagpal
Mukesh Nagpal
TMTerry Martinich
Terry Martinich
RBRalph Barone
Ralph Barone
TJTony Jiao
Tony Jiao
TSTyler Scott
Tyler Scott
CHCharles Henville
Charles Henville
The cost of interconnection is an important factor in Non Utility Generator (NUG) overall project costs. This cost has to be minimized without compromising the safety or reliability of the transmission system. The lowest cost interconnection is a transmission line tap. However, low cost taps may negatively impact transmission system performance and protection system performance. The negative impacts can often be mitigated with increasing complexity (and cost) of the interconnection. This paper describes BC Hydro's experience with studying interconnection proposals, using internally developed protection criteria to minimize costs while retaining acceptable protection performance.

9 December 2002
Verified
Conference Paper
Closed access
GNG. Neily
G. Neily
RBR. Barone
R. Barone
GJG. Josin
G. Josin
DCD. Charney
D. Charney