Sae-Hyun Ji

Sae-Hyun Ji

Auto-generated profile, based on publicly available information

Sae-Hyun Ji

Ph.D. Candidate, Dept. of Architecture, Seoul National Univ., San 56-1 Shinrim-dong, Seoul, Korea

Research Focus & Metrics

Academic Career Length

18Years (2009-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2012 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
SJSae-Hyun Ji
Sae-Hyun Ji
종이종직 이
종직 이
HLHyun-Soo Lee
Hyun-Soo Lee
Case-based reasoning (CBR) utilizes old solutions to solve a present problem. However, as no past situation is ever exactly the same as a new one, old solutions should be fitted for new circumstances, which is called case adaptation. Thus, the success of CBR depends on the ability of case adaptation. Generally, the case adaptation method can be categorized by two methods: decreasing the need for adaptation and increasing the capability. Nevertheless, previous research has focused on applying the method itself and rarely examined the adaptation or candidates selection. As an effort to enhance the performance of CBR, this research develops a case adaptation method that is balanced for both methods. To validate the method, a CBR cost model was developed that has an adaptation function using 129 military barrack projects in Korea, and then the method was tested by using 13 test cases. Furthermore, an applicability test was conducted based on 164 Korean public apartment projects.

1 May 2011 in Canadian Journal of Civil Engineering
Verified
Journal Article
Closed access
SJSae-Hyun Ji
Sae-Hyun Ji
MPMoonseo Park
Moonseo Park
HLHyun-Soo Lee
Hyun-Soo Lee

1 September 2017 in Automation in Construction
Verified
Journal Article
Closed access
JAJoseph Ahn
Joseph Ahn
MPMoonseo Park
Moonseo Park
HLHyun-Soo Lee
Hyun-Soo Lee
SASung Jin Ahn
Sung Jin Ahn
SJSae-Hyun Ji
Sae-Hyun Ji
BSBo-Sik Son
Bo-Sik Son

1 November 2009 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
MPMoonseo Park
Moonseo Park
SJSae-Hyun Ji
Sae-Hyun Ji
HLHyun-Soo Lee
Hyun-Soo Lee
WKWooyoung Kim
Wooyoung Kim

1 July 2014 in Automation in Construction
Verified
Journal Article
Closed access
JAJoseph Ahn
Joseph Ahn
SJSae-Hyun Ji
Sae-Hyun Ji
MPMoonseo Park
Moonseo Park
HLHyun-Soo Lee
Hyun-Soo Lee
SKSooyoung Kim
Sooyoung Kim
SSSang-Wook Suh
Sang-Wook Suh

1 January 2019 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
SJSae-Hyun Ji
Sae-Hyun Ji
JAJoseph Ahn
Joseph Ahn
HLHyun-Soo Lee
Hyun-Soo Lee
KHKyeongjin Han
Kyeongjin Han
Construction projects require huge amounts of capital and have many risk factors due to the unique industry characteristics. For a project to be successful, accurate cost estimation during the design phase is very important. Thus, this research aims to develop a cost estimation model where a modification method integrates influential factors with significant parameters. This study identified a modified parameter‐making process, which integrates many influential factors into a small number of significant parameters. The proposed model estimates the cost using quantity‐based modified parameters multiplied by their price. A case study was conducted with 24‐residence building project, and the estimation accuracy of the suggested method and a CBR model were compared. The proposed model achieved higher overall cost‐estimation accuracy and stability. A large number of influence factors can be modified as simple representatives and overcome the limitations of a conventional cost estimation model. The paper originality relates to providing a modified parameter‐making process to enhance reliability of a cost estimation. In addition, the suggested cost model can actively respond to the iterative requirements of recalculation of the cost.