Mehran Zeynalian

Mehran Zeynalian

Auto-generated profile, based on publicly available information

Mehran Zeynalian

University of Isfahan

Research Focus & Metrics

Academic Career Length

16Years (2011-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 April 2015 in Journal of Constructional Steel Research
Verified
Journal Article
Closed access
MZMehran Zeynalian
Mehran Zeynalian
HRH.R. Ronagh
H.R. Ronagh

1 February 2018 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
FGFarzad Ghodoosi
Farzad Ghodoosi
SASoliman Abu-Samra
Soliman Abu-Samra
MZMehran Zeynalian
Mehran Zeynalian
Tarek ZayedTarek Zayed
Tarek Zayed
Maintenance cost optimization and performance prediction of bridge structures have become important challenges in bridge management systems. The performance of bridge structures should be carefully monitored, especially in severe climatic conditions. The objective of this study is to develop a rational method that predicts the most cost-effective intervention schedule for bridges, where the structural safety is maintained with the minimum possible lifecycle cost. The framework functions through (1) a central database that contains the asset inventory along with the maintenance actions list, (2) a biquadratic system reliability–based deterioration model, (3) an intervention effect model that simulates the effect of undertaking various intervention scenarios on the bridge superstructure performance, (4) a financial model that computes the lifecycle costs throughout the planning horizon, and (5) an optimization model that utilizes a genetic algorithms engine to compare the different intervention scenarios and selects the most cost-effective one. This method is applied to a simply supported bridge superstructure case study, designed in accordance with Canadian highway bridge design standards. The results indicate that undertaking less costly minor repair actions may considerably reduce the lifecycle costs as a result of decreasing the number of costly major interventions. The optimum scenario resulted in an equivalent uniform annual cost of US$8,277 per year, which shows 4.5 times cost saving as compared with the conventional scenario where only major repairs are performed. This innovative combination of reliability analysis, nonlinear finite-element modeling, and genetic algorithms optimization supports asset managers in long-term planning and ensures undertaking rational and objective decisions.

1 October 2012 in Journal of Constructional Steel Research
Verified
Journal Article
Closed access
MZM. Zeynalian
M. Zeynalian
HRH.R. Ronagh
H.R. Ronagh
SHS. Hatami
S. Hatami

1 July 2021 in Thin-Walled Structures
Verified
Journal Article
Closed access
MHMahmoud Hosseinpour
Mahmoud Hosseinpour
MZMehran Zeynalian
Mehran Zeynalian
AAAbdoreza Ataei
Abdoreza Ataei
MDMaryam Daei
Maryam Daei

1 November 2012 in Thin-Walled Structures
Verified
Journal Article
Closed access
MZM. Zeynalian
M. Zeynalian
HRH.R. Ronagh
H.R. Ronagh

1 February 2012 in Thin-Walled Structures
Verified
Journal Article
Closed access
MZMehran Zeynalian
Mehran Zeynalian
HRH.R. Ronagh
H.R. Ronagh