Sri Harsha Nistala

Sri Harsha Nistala

Auto-generated profile, based on publicly available information

Sri Harsha Nistala

TCS Research, Tata Consultancy Services, Pune, India

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
28 May 2022 in Transactions of the Indian National Academy of Engineering
Verified
Journal Article
Closed access
PDF file
SNSri Harsha Nistala
Sri Harsha Nistala
KSKuldeep Singh
Kuldeep Singh
PVPhanibhargava Vakkantham
Phanibhargava Vakkantham
APAditya Pareek
Aditya Pareek
VMVishnu Masampally
Vishnu Masampally
VRVenkataramana Runkana
Venkataramana Runkana

20 May 2022 in Transactions of the Indian Institute of Metals
Verified
Journal Article
Closed access
PDF file
JBJayasree Biswas
Jayasree Biswas
AGAkash Goyal
Akash Goyal
BSBalaji Selvanathan
Balaji Selvanathan
SNSri Harsha Nistala
Sri Harsha Nistala
VRVenkataramana Runkana
Venkataramana Runkana

7 July 2022 in International Journal of Prognostics and Health Management
Verified
Journal Article
Open access
PDF file
BSBalaji Selvanathan
Balaji Selvanathan
SNSri Harsha Nistala
Sri Harsha Nistala
VRVenkataramana Runkana
Venkataramana Runkana
SDSaurabh Jaywant Desai
Saurabh Jaywant Desai
SAShashank Agarwal
Shashank Agarwal
Breakdowns and unplanned shutdowns in industrial processes and equipment can lead to significant loss of availability and revenue. It is imperative to perform optimal maintenance of such systems when signs of abnormal behavior are detected and before they propagate and lead to catastrophic failure. This is particularly challenging in systems with interconnected multiple components as it is difficult to isolate the effect of one component on the operation of other components in the system. In this work, an ensemble approach based on Cascaded Convolutional neural network and Long Short-term Memory (CC-LSTM) network models is proposed for detecting and predicting the time of onset of faults in interconnected multicomponent systems. The performance of the ensemble CC-LSTM model was demonstrated on an industrial 4-component system and was found to improve the accuracy of onset time predictions by ~15% compared to individual CC-LSTM models and ~25-40% compared to commonly used deep learning techniques such as dense neural networks, convolutional neural networks and LSTMs. The CC-LSTM and the ensemble models also had the lowest missed detection rates and zero false positive rates making them ideal for real-time monitoring and fault detection in multicomponent systems.

18 May 2026 in Energy & Fuels
Verified
Journal Article
Closed access
SRShanmuk Srinivas Ravuru
Shanmuk Srinivas Ravuru
SNSri Harsha Nistala
Sri Harsha Nistala
JSJames A Sawada
James A Sawada
ARArvind Rajendran
Arvind Rajendran

17 January 2024 in ChemRxiv
Verified
Preprint
Open access
PDF file
SNSri Harsha Nistala
Sri Harsha Nistala
JBJayasree Biswas
Jayasree Biswas
RKRajan Kumar
Rajan Kumar
RPRohan Pandya
Rohan Pandya
PRPradeep Rathore
Pradeep Rathore
AGAdity Ganguly
Adity Ganguly
It is necessary to maintain the silicon content of hot metal in a stipulated range to improve the productivity and energy consumption of a blast furnace. Significant research therefore went into the development of data-driven models to predict hot metal silicon content in real-time. However, these models use only a small subset of blast furnace variables that are chosen using prior process knowledge. As each blast furnace is unique in its operation, using pre-selected variables would lead to sub-optimal models. To address this, a machine learning based ensemble feature selection and modeling approach is proposed. In this approach, all the available furnace variables are ranked using multiple feature selection techniques based on their impact on silicon content. The individual ranks are combined to obtain an ensemble ranking of variables and the top variables in the ranking are used to build data-driven silicon prediction models. This approach is applied to an industrial blast furnace wherein 374 variables are used to obtain the ensemble ranking. While some of the top 100 variables in the ensemble ranking matched those that are commonly used in silicon predictions models, several new variables have also been identified. Silicon prediction models trained using the top 100 variables resulted in a hot rate of ~90% demonstrating the efficacy of the proposed approach. Real-time predictions from the models will enable blast furnace operators to control the silicon content without having to wait for laboratory results.

10 July 2025
Verified
Book Chapter
Closed access
PDF file
VRVenkataramana Runkana
Venkataramana Runkana
RMRatnamala Manna
Ratnamala Manna
ADAnagha Deshpande
Anagha Deshpande
SMSandipan Maiti
Sandipan Maiti
NSNital Shah
Nital Shah
RKRajan Kumar
Rajan Kumar