Lin Tang

Lin Tang

Auto-generated profile, based on publicly available information

Lin Tang

Key Laboratory of Karst Georesources and Environment, Ministry of Education, College of Resources and Environmental Engineering, Guizhou University, Guiyang, China

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
4 January 2022 in Soil Dynamics and Earthquake Engineering
Verified
Journal Article
Closed access
LPLifang Pai
Lifang Pai
HWHonggang Wu
Honggang Wu
WGWei Guan
Wei Guan
HWHong Wei
Hong Wei
LTLin Tang
Lin Tang

1 February 2023 in Journal of Mountain Science
Verified
Journal Article
Closed access
PDF file
LTLin Tang
Lin Tang
HWHonggang Wu
Honggang Wu
HWHong Wei
Hong Wei
KFKang Feng
Kang Feng
GRGuo-Jun Reng
Guo-Jun Reng

13 April 2023 in Journal of Mountain Science
Verified
Journal Article
Closed access
PDF file
HWHong Wei
Hong Wei
HWHonggang Wu
Honggang Wu
DWDaoyong Wu
Daoyong Wu
LTLin Tang
Lin Tang
LPLifang Pai
Lifang Pai
WGWei Guan
Wei Guan

4 May 2022 in Geofluids
Verified
Journal Article
Open access
PDF file
LTLin Tang
Lin Tang
DWDaoyong Wu
Daoyong Wu
HWHonggang Wu
Honggang Wu
HWHong Wei
Hong Wei
JPJun Pang
Jun Pang
HSHao Sun
Hao Sun
The relationship between slope and prevention structures under the action of rainfall is complicated. In this paper, a series of model tests were carried out to study the coevolution mechanism of slope and prevention structures under rainfall. It was found that the prestressed grouting steel anchor tube frame beam composite structure has a good reinforcement and protective effect on the slope. Specifically, less damage degree is observed for a slope with prestressed grouting steel anchor tube frame beam, while the slope of without prestressed grouting steel anchor tube frame beam suffers from severe deformation. Under the effect of rainfall, the evolution process of slope and prevention structure cooperative deformation can be divided into three stages: creep stage, extrusion stage, and acceleration stage. The antisliding force provided by the prevention structure is positively correlated with the slope deformation. Moreover, as an initiating factor for changes in various monitoring parameters, rainfall plays a dominant role in the variation of earth pressure reinforcement by steel anchor tube.