Hanna Ryzhakova

Hanna Ryzhakova

Auto-generated profile, based on publicly available information

Hanna Ryzhakova

Department of Management in Construction, Kyiv National University of Construction and Architecture, 03037 Kyiv, Ukraine

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
23 March 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
RTRoman Trach
Roman Trach
OKOleksandr Khomenko
Oleksandr Khomenko
Yuliia TrachYuliia Trach
Yuliia Trach
OKOleksii Kulikov
Oleksii Kulikov
MDMaksym Druzhynin
Maksym Druzhynin
OOOlha Obodіanska
Olha Obodіanska
The purpose of this research is to study the communication network among the participants in a construction project. The proposed approach contains the solving of the following tasks: identification of the key factors that affect the communication quality; calculation of the “communication quality” indicator between each pair of participants using fuzzy logic; and evaluation of the key measures of centrality using the tools of a Social Network Analysis. Solving the set tasks can help break the problem of the low level of efficiency of construction project deliveries. This study was conducted when the design stage was already complete and the construction project had 17 participants. We used the following factors influencing communication quality: timeliness, understanding, bidirectionality, use of IT tools in communication acts and adequacy. The use of fuzzy logic tools can minimise the subjectivity of the qualitative data obtained from the questionnaires. The analysis of five centrality measures showed that “Project manager”, “Chief engineer”, “Construction site manager”, “Construction works manager” and “Architect” had the greatest values in comparison with other network participants. On the one hand, this organisational structure of communication can be considered correct because the main information flows through the project managers, who make the decisions. On the other hand, this indicates a significant dependence of the construction project on these participants and, in the event of certain risk events, may lead to a decrease in the efficiency of its implementation. The methods presented in this article can be used in project management to analyse a real communication network.

30 January 2026 in Sustainability
Verified
Journal Article
Open access
PDF file
RTRoman Trach
Roman Trach
ICIurii Anatoliyovich Chupryna
Iurii Anatoliyovich Chupryna
RTRuslan Tormosov
Ruslan Tormosov
MDMaksym Druzhynin
Maksym Druzhynin
Yuliia TrachYuliia Trach
Yuliia Trach
DRDmytro Ratnikov
Dmytro Ratnikov
Efficient coordination within the supply chain of prefabricated construction remains a significant challenge due to the high level of interdependence among supply chain participants, the complexity of information flows, and the sensitivity of construction processes to communication delays. This study proposes an integrated methodological framework that combines fuzzy logic and social network analysis (SNA) to evaluate the structural stability and interaction dynamics of supply chain participants. First, a synthetic indicator—link stability—is introduced to quantify the robustness of relationships between supply chain actors. Link stability is defined as a function of five determinants: collaboration level, trust level, communication quality, adoption of digital tools, and effectiveness of dispute resolution. Fuzzy logic is applied to calculate this indicator for each pair of participants, reducing subjectivity in expert assessments. Second, the link stability matrix is used to compute a wide set of centrality measures, including degree, betweenness, closeness, eigenvector, PageRank, information, harmonic, and second-order centralities. These metrics reveal the structural influence of each actor within the network and allow for the identification of core, semi-peripheral, and peripheral roles. A heatmap demonstrates a highly centralized network structure dominated by managerial and design roles. The results contribute to improving supply chain resilience, enhancing communication pathways, and supporting decision-making in prefabricated construction projects.

20 December 2021 in Management of Development of Complex Systems
Verified
Journal Article
Open access
PDF file
ASAndrii Shpakov
Andrii Shpakov
OPOleh Prykhodko
Oleh Prykhodko
IKIlya Kushnir
Ilya Kushnir
GNGeorgiy Nikolaiev
Georgiy Nikolaiev
NPNina Petrukha
Nina Petrukha
ГРГанна Рижакова
Ганна Рижакова
The article is devoted to solving a topical scientific and applied problem of developing theoretical foundations and methodology, which contains information models, methods, cognitive mechanisms that allow analysis, selection, optimization and evaluation of the implementation of modern concepts of information modeling and integrated implementation of construction projects. Modern concepts that influence the cognitive mechanisms of project management in construction are studied. The analysis showed that obtaining a greater effect from the use of knowledge of participants in the construction project is possible with the joint implementation of modern concepts of enterprise integration and information modeling in construction. The methodology is implemented in scientific and applied tools for decision-making on the content, tools, diagnostic indicators and the expected result of the transformation of the operating system and organizational structure of the construction company, which carries out and adjusts its activities in a complex multi-project operating field. the main factors influencing the synergetic effect formed during the integrated implementation of the project with the use of innovative tools of information modeling in construction are formulated and substantiated. Conceptual principles of business process renewal, management systems for a construction company based on digitalization (digital administration), which are positioned as a means of achieving competitive advantages in the multi-project field of construction development, are substantiated.

29 April 2026 in Applied Sciences
Verified
Journal Article
Open access
PDF file
RTRoman Trach
Roman Trach
ICIurii Anatoliyovich Chupryna
Iurii Anatoliyovich Chupryna
RTRuslan Tormosov
Ruslan Tormosov
VLViktor Leshchynsky
Viktor Leshchynsky
Yuliia TrachYuliia Trach
Yuliia Trach
OOOleh Onofriichuk
Oleh Onofriichuk
Post-war reconstruction requires effective decision-support tools capable of integrating technical, economic, and organizational criteria under conditions of high uncertainty. The evaluation and prioritization of damaged buildings for recovery interventions are critical challenges for reconstruction project management. This study proposes a hybrid decision-support framework for assessing the strategic feasibility of building recovery using a novel Strategic Revitalization Index (SRI). The proposed methodology integrates a hierarchical fuzzy inference system, simulation techniques, and an artificial neural network surrogate model. The fuzzy model aggregates four key evaluation dimensions: technical condition of the building, economic feasibility of recovery actions, project implementation capability, and environmental and social impact. To analyze the model’s behavior and generate training data, a synthetic dataset was created using Latin Hypercube Sampling, covering a wide range of possible reconstruction conditions. The generated dataset was subsequently used to train an artificial neural network capable of approximating the nonlinear mapping implemented by the fuzzy decision model. The obtained results demonstrate high predictive performance of the surrogate model, with R2 = 0.976, RMSE = 0.0266, MAE = 0.0133, and MAPE = 4.95%. Scenario analysis further illustrates how different recovery strategies influence SRI values and enables comparison of alternative reconstruction approaches. The proposed framework provides a flexible analytical tool for supporting strategic decision-making in post-war reconstruction projects. By combining fuzzy logic, simulation techniques, and machine learning, the model enables systematic prioritization of recovery strategies and may support large-scale reconstruction planning in post-conflict environments.

11 April 2022 in Management of Development of Complex Systems
Verified
Journal Article
Open access
PDF file
HPHanna Petrenko
Hanna Petrenko
IHIgor Hrynenko
Igor Hrynenko
GNGeorgiy Nikolaiev
Georgiy Nikolaiev
NPNina Petrukha
Nina Petrukha
HRHanna Ryzhakova
Hanna Ryzhakova
KRKаterina Rogach
Kаterina Rogach
The article adapted and transformed an innovative scientific and analytical means of risk-controlling operational systems of construction contractors and multi-agent environments of construction projects based on the concept and methodological platform of compliance management, which allows early identification of BP risks and stakeholder activities and, taking them into account, to form a rational a version of the budget-resource and calendar program for the implementation of projects, subject to a compromise agreement of the economic interests of stakeholders and a rational distribution between them (compliance) of responsibility for the content, regulations, budget and consequences of anti-risk actions. A hierarchical model of quantitative risk assessment of anti-crisis management of a construction enterprise was built, which, with the help of the apparatus of fuzzy mathematics, makes it possible to assess risk factors and risks at each level of the hierarchy. The proposed model provides an opportunity to identify threats (risks of a catastrophic level), as well as the most significant risk factors based on the sensitivity analysis method, which is important for making managerial decisions in conditions of uncertainty. The conceptual principles of the management activity of the enterprise, taking into account its financial and economic condition, have gained further development, which differ from the current ones in that, in the absence of signs of a crisis, they provide for the functioning of the economic security system with its performance of risk management and anti-crisis management functions, and in crisis conditions - the introduction of anti-crisis management with the delegation of certain tasks and functions to the economic security service and the risk management unit in order to prevent the deterioration of the financial and economic situation and ensure the conditions for the effective implementation of anti-crisis measures.

26 January 2024
Verified
Book Chapter
Closed access
PDF file
IRIvan L. Rogovskii
Ivan L. Rogovskii
NRNadiia P. Reznik
Nadiia P. Reznik
NONataliia V. Osadchuk
Nataliia V. Osadchuk
TITetiana M. Ivanova
Tetiana M. Ivanova
MZMiroslava M. Zinchenko
Miroslava M. Zinchenko
HRHanna Ryzhakova
Hanna Ryzhakova