Tao Wang

Tao Wang

Auto-generated profile, based on publicly available information

Tao Wang

Key Laboratory of Ministry of Education for Geomechanics and Embankment Engineering Hohai University Nanjing China

Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
7 September 2024 in Journal of Rock Mechanics and Geotechnical Engineering
Verified
Journal Article
Open access
HCHong-Zhi Cui
Hong-Zhi Cui
BTBin Tong
Bin Tong
TWTao Wang
Tao Wang
JDJie Dou
Jie Dou
JJJian Ji
Jian Ji

27 May 2023 in Computers and Geotechnics
Verified
Journal Article
Open access
TWTao Wang
Tao Wang
JJJian Ji
Jian Ji
GFGuoyang Fu
Guoyang Fu
QLQing Lü
Qing Lü

16 January 2024 in International Journal for Numerical and Analytical Methods in Geomechanics
Verified
Journal Article
Open access
TWTao Wang
Tao Wang
JJJian Ji
Jian Ji
In the context of geotechnical uncertainty characterization, the reliability‐based design optimization (RBDO) provides an effective means to achieve the most balanced design outcome between the targeted safety and the risk‐based cost planning. As a common practice, the geotechnical RBDO is conducted on the premise of prescribed statistical information of those uncertain parameters. Nevertheless, the uncertain geotechnical parameters are usually subject to amendment resulting from further site investigation. In other words, changing design scenarios must be properly handled in advanced geotechnical RBDO. Thus, in this study, a novel reliability updating method using a sample reweighting technique that requires only a single simulation run is developed for RBDO. Simultaneously, the RBDO is readily extendable to RBDO updating under changing design scenarios while avoiding any further re‐evaluation of the performance functions. The proposed RBDO updating method allows for the consideration of a continuous design space encompassing an infinite number of feasible designs, whereas the existing simulation‐based method can only consider a finite number of feasible designs in a discrete design space. Moreover, the efficiency and flexibility of the proposed RBDO updating method are illustrated through a standard RBDO test problem and a practical rock slope design example, where the changing design scenarios of different means, standard deviations, correlation coefficient, and distributions are respectively studied.

18 October 2024 in International Journal for Numerical and Analytical Methods in Geomechanics
Verified
Journal Article
Closed access
TWTao Wang
Tao Wang
ZWZhaocheng Wang
Zhaocheng Wang
ZZZheming Zhang
Zheming Zhang
WLWenwang Liao
Wenwang Liao
JJJian Ji
Jian Ji

18 October 2017 in Ocean Dynamics
Verified
Journal Article
Closed access
PDF file
YCYang Chen
Yang Chen
WJWensheng Jiang
Wensheng Jiang
XCXu Chen
Xu Chen
TWTao Wang
Tao Wang
CBChangwei Bian
Changwei Bian

13 October 2025 in Computers and Geotechnics
Verified
Journal Article
Closed access
TWTao Wang
Tao Wang
YHYining Hu
Yining Hu
TZTong Zhang
Tong Zhang
SLSikan Li
Sikan Li
JJJian Ji
Jian Ji