IFMIF-DONES (International Fusion Materials Irradiation Facility-DEMO Oriented NEutron Source) is a facility whose purpose is to obtain data on materials by irradiating them under conditions equivalent to those of the DEMO (DEMOstration) fusion reactor. Tungsten and CuCrZr alloy are two candidate materials to be used in DEMO, tungsten for the first wall and divertor (DIV) and CuCrZr alloy for the DIV. So, studying the behavior of these materials in IFMIF-DONES facility and comparing the results with the DEMO environment is crucial. In the high flux test module in IFMIF-DONES has been considered a realistic distribution of specimens. The IFMIF-EVEDA beam have been used with a footprint size of 20 × 5 cm2, the nominal energy is 40 MeV with a current of 125 mA, for the calculation other energies have been considered 25, 30 and 35 MeV. The results of IFMIF-DONES have been compared with different DEMO concepts, Dual Coolant Lithium Lead, Water Cooled Lithium Lead and Helium Cooled Pebble Bed. In general, the primary displacement damage rate meets between IFMIF-DONES and DEMO, while the gas production is at the limit for W and fulfilled for the CuCrZr alloy.
IFMIF-DONES is a facility under construction in Granada, whose main goal is the validation and characterization of materials under a fusion prototypic irradiation field. This field is created by the interaction of a high energy intense continuous deuteron beam and a flowing liquid lithium target. The requirements imposed on the beam at the interaction point are a complex trade-off among the scientific experimental needs for the materials irradiation defined at the top-level requirements (20 dpa in a volume of 0.3 dm3 and 50 dpa in 0.1 dm3), and the technical constraints of several systems such as the Accelerator Systems, the Lithium Systems, and the Test Systems. Recent simulations with the initial definition of beam-on-target requirements showed the necessity of redefining them in order to fulfill the irradiation needs. This contribution will address the main challenges to gather the inputs for the definition and reassessment of the beam-on-target requirements. A comparison detailing the main changes compared to the previous ones will be given, together with a short overview of the studies ongoing by different systems to analyze the impact of each beam-on-target requirements on the performance of the whole facility.