Али Ченарани

Али Ченарани

Auto-generated profile, based on publicly available information

Али Ченарани

Zhukovsky National Aerospace University «Kharkiv Aviation Institute», Chkalovа str., 17, Kharkiv, Ukraine, 61070

Research Focus & Metrics

Academic Career Length

11Years (2016-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2017 in Journal of Engineering Science and Technology Review
Verified
Journal Article
Closed access
ACAli Chenarani
Ali Chenarani
EDE. A. Druzhinin
E. A. Druzhinin
DKDmitriy Kritskiy
Dmitriy Kritskiy

26 May 2016 in Technology audit and production reserves
Verified
Journal Article
Open access
PDF file
ДКДмитрий Николаевич Крицкий
Дмитрий Николаевич Крицкий
ОПОльга Константиновна Погудина
Ольга Константиновна Погудина
ЕДЕвгений Анатольевич Дружинин
Евгений Анатольевич Дружинин
АЧАли Ченарани
Али Ченарани
The method for monitoring the scope of development project of complex technical system was modified. This method can be used for the interim quality evaluation and financial justification of the result at all stages of development. The current monitoring methods were analyzed and it was concluded about the need to provide more information on the technical implementation of the project. The method of earned value got a further development for analysis of the data for the hypotheses and verified solutions offered by designers and technologists in various stages of development of complex technical systems. The system of inequalities for monitoring indicators of quality of the project content is proposed. This system of equations was taken into account peculiarities of the creation of complex technical systems: quality of these projects is determined by the result – a project product; costs are compensated during the operational phase; payback time shall be compared with the technical resource of project product; resources of the organization should be enough for the project realization. Experimental data of using this method in a scientific research institute of physical modeling problems were obtained. Using a modified method reduced development time up to 21 %.

25 February 2016 in Bulletin of NTU "KhPI". Series: Strategic management, portfolio, program and project management
Verified
Journal Article
Open access
PDF file
АЧАли Ченарани
Али Ченарани
ЕДЕвгений Анатольевич Дружинин
Евгений Анатольевич Дружинин
ОПОльга Константиновна Погудина
Ольга Константиновна Погудина
The importance of complex technical products and the role of design phase in developing these products are stated. Some specific features which indicate the high degree of uncertainty and risk in this phase (preliminary design of aviation engines as a more specific case) are mentioned. Considering the importance of risk management in these situations, literature review and analysis in the field of risk management approaches and standards are performed in order to evaluate the possibility of using or developing them in further research. Differences and similarities between these approaches and standards as well as different tools and solutions are investigated. Some new approaches and trends for managing risk and uncertainty in projects are presented