Zdenek Zizka

Zdenek Zizka

Auto-generated profile, based on publicly available information

Zdenek Zizka

METROPROJEKT PRAHA

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 April 2018 in Tunnelling and Underground Space Technology
Verified
Journal Article
Closed access
JKJakob Küpferle
Jakob Küpferle
ZZZdenek Zizka
Zdenek Zizka
BSBritta Schoesser
Britta Schoesser
ARArne Röttger
Arne Röttger
MAMichael Alber
Michael Alber
WTWerner Theisen
Werner Theisen

20 August 2020 in Geomechanics and Tunnelling
Verified
Journal Article
Closed access
PDF file
ZZZdenek Zizka
Zdenek Zizka
SKSebastian Kube
Sebastian Kube
BSBritta Schoesser
Britta Schoesser
MTMarkus Thewes
Markus Thewes


18 March 2023
Verified
Book Chapter
Open access
PDF file
BSBritta Schoesser
Britta Schoesser
ALArash Alimardani Lavasan
Arash Alimardani Lavasan
WBWiebke Baille
Wiebke Baille
TBThomas Barciaga
Thomas Barciaga
SFSascha Freimann
Sascha Freimann
ZZZdenek Zizka
Zdenek Zizka
The excavation process in mechanised tunnelling consists of various technical components whose interaction enables safe tunnel driving. In reference to the existing geological and hydrogeological conditions, different types of face support principles are applied. In case of fine-grained cohesive soils, the face support is provided by Earth Pressure Balanced (EPB) machines, while the Slurry Shield (SLS) technology is adapted in medium-grained to coarse grained non-cohesive soils even under high groundwater pressure. For both machine techniques, the support medium (the excavated and conditioned soil (EPB) or the bentonite suspension (SLS)) needs to be adapted for the specific application. Within this chapter, the theoretical, experimental and numerical developments and results are presented concerning the fundamentals of face support in EPB and SLS tunnelling including the rheology of the support medium, the material transport and mixing process of the excavated soil and the added conditioning agent in the excavation chamber of an EPB shield machine as well as the constitutive models for investigations of the near field interactions between surrounding soil and advancing shield machine.