Ashutosh Kumar

Ashutosh Kumar

Auto-generated profile, based on publicly available information

Ashutosh Kumar

Indian Institute of Technology Mandi

Research Focus & Metrics

Academic Career Length

12Years (2015-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 October 2016 in International Journal of Geomechanics
Verified
Journal Article
Closed access
AKAshutosh Kumar
Ashutosh Kumar
DCDeepankar Choudhury
Deepankar Choudhury
RKRolf Katzenbach
Rolf Katzenbach
The combined pile–raft foundation (CPRF) has been widely recognized as economic and rational foundation for high-rise buildings when subjected to vertical loading because of its effectiveness in load sharing by both raft and pile components. This results in smaller total and differential settlements with a reduced number of piles as compared with group piles. Until recently, the behavior of CPRF when subjected to lateral and real earthquake loading conditions in addition to vertical loads has not been well understood as a result of the complexities involved in the interaction of the pile, soil, and raft under such loading considerations. In the present study, an attempt has been made to investigate the behavior of CPRF with the use of centrifuge testing and a numerical model under pseudostatic and dynamic loading conditions carried out with finite-element software. After successful validation of the present CPRF model with both centrifuge and numerical model results, the same model was used for fu...

1 May 2018 in Computers and Geotechnics
Verified
Journal Article
Closed access
AKAshutosh Kumar
Ashutosh Kumar
DCDeepankar Choudhury
Deepankar Choudhury

27 January 2024 in Landslides
Verified
Journal Article
Closed access
PDF file
ESEedy Sana
Eedy Sana
AKAshutosh Kumar
Ashutosh Kumar
EREllen Robson
Ellen Robson
RPR. Prasanna
R. Prasanna
UKUday Kala
Uday Kala
DTDavid G. Toll
David G. Toll

23 January 2017 in Proceedings of the Institution of Civil Engineers - Geotechnical Engineering
Verified
Journal Article
Closed access
AKAshutosh Kumar
Ashutosh Kumar
MPMilind Patil
Milind Patil
DCDeepankar Choudhury
Deepankar Choudhury
The present work explains the use of a piled-raft foundation in a raw materials storage building in South Bà Rịa–Vũng Tàu Province of Vietnam. The proposed foundation comprises an 81 m by 55·5 m raft that connects 581 precast hollow concrete piles 20 m long with 400 mm outer diameter. The proposal takes into consideration a specific in situ soil profile and a loading scenario. After the effectiveness of a single bay of the foundation had been checked, the entire foundation system was modelled using finite-element-based geotechnical software to enable a detailed soil–structure interaction analysis. Field pile load test data were used to validate the finite-element model. Various loading conditions, such as all compartments full to all compartments empty, were considered in the analysis. The results of the analyses indicate the importance of the raft in sharing 23–31% of the total vertical load. The results obtained – such as vertical settlement, differential settlement, tilt in the raft and axial load in the piles – were used in the final design. These results can also be used in similar practical applications.

1 September 2018 in Soil Dynamics and Earthquake Engineering
Verified
Journal Article
Closed access
JRJashod Roy
Jashod Roy
AKAshutosh Kumar
Ashutosh Kumar
DCDeepankar Choudhury
Deepankar Choudhury

1 October 2020 in International Journal of Geomechanics
Verified
Journal Article
Closed access
PDF file
JRJashod Roy
Jashod Roy
AKAshutosh Kumar
Ashutosh Kumar
DCDeepankar Choudhury
Deepankar Choudhury
A new simplified approach based on the pseudostatic method of analysis is proposed to investigate the response of a combined pile–raft foundation (CPRF) and a group pile considering the complex interaction. In this method, the raft is considered as a plate supported by group of piles and soil, where piles are modeled as Euler beam elements resting on elastic Winkler foundation and the raft is divided into square grids attached with horizontal springs. The reliability of the proposed method is verified by laboratory testing results and those of Plaxis3D simulations for a 4-piled raft system. Good agreement between the laboratory results, numerical simulations, and the proposed method is demonstrated, showing the potential applicability of the new simplified method.