Marco Favaretti

Marco Favaretti

Auto-generated profile, based on publicly available information

Marco Favaretti

Department of Civil, Environmental and Architectural Engineering,University of Padova,Italy

Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
6 April 2022 in Geotextiles and Geomembranes
Verified
Journal Article
Closed access
GCGiampaolo Cortellazzo
Giampaolo Cortellazzo
LRLuis E. Russo
Luis E. Russo
SBStefano Busana
Stefano Busana
LCLaura Carbone
Laura Carbone
MFMarco Favaretti
Marco Favaretti
HHHartmut Hangen
Hartmut Hangen

1 August 2018 in Canadian Geotechnical Journal
Verified
Journal Article
Open access
Nicola MoraciNicola Moraci
Nicola Moraci
SBStefano Busana
Stefano Busana
GCGiampaolo Cortellazzo
Giampaolo Cortellazzo
MFMarco Favaretti
Marco Favaretti
MMMaria Clorinda Mandaglio
Maria Clorinda Mandaglio
MSMicol Schepis
Micol Schepis
Design and construction of a mineral barrier layer involve many experimental and technological aspects. A specific soil water content and laboratory compaction energy, which are required to obtain permeability values according to the national regulation in force, must be determined. It is also necessary to control water content, compaction energy, and permeability of the liner actually compacted in situ. This paper shows how a compacted mineral barrier mainly composed of silty clay soil (the excavated soil is a natural but potentially re-usable waste product) was put in place to cover a large municipal solid waste (MSW) landfill and compacted using a heavy dumper, capable of achieving an adequate compaction degree. The in situ hydraulic properties of the liner were compared with those obtained by laboratory testing and to the limits imposed by the Italian regulation. The actual compaction degree was checked by in situ tests. Hydraulic conductivity tests were carried out in situ, using Boutwell and Guelph permeameters, and in the laboratory using rigid wall and flexible wall permeameters. In situ testing provided more realistic permeability values than laboratory ones and demonstrated that the actual construction procedure used was effective to obtain the design targets.

5 December 2020 in Indian Geotechnical Journal
Verified
Journal Article
Open access
PDF file
GCGiampaolo Cortellazzo
Giampaolo Cortellazzo
EBEugenio Bellò
Eugenio Bellò
SBStefano Busana
Stefano Busana
MFMarco Favaretti
Marco Favaretti
The multilayer system of a non-hazardous solid wastes landfill cover, required by most international regulations, includes a granular layer of adequate permeability and thickness for the collection and drainage of biogas. The choice of the most suitable material generally falls on granular soils, containing very low percentages of fines. The paper presents the possibility of replacing natural soils with cullet, obtained by the glass shredding, and widely available on the market. Its hydraulic conductivity with regard to biogas and its granulometric compatibility with the adjacent layers may be initially assessed by means of the usual filter design criteria. Then, its crushing strength, under static and cyclical loads, must be evaluated, since the capping systems are crossed by heavy earthmoving trucks, and consequently, there is the possibility of a change of the cullet granulometric distribution. As cullet is not a conventional material, the usual geotechnical laboratory tests cannot be directly applied to it. The paper suggests an innovative laboratory procedure, defined as a static and cyclical punching test, which allows to evaluate the crushing resistance of cullet by using the traditional apparatus for soil compaction.

11 October 2017 in Geotechnical and Geological Engineering
Verified
Journal Article
Closed access
PDF file
ASAndrea Dei Svaldi
Andrea Dei Svaldi
MFMarco Favaretti
Marco Favaretti
AMAlberto Mazzucato
Alberto Mazzucato

30 June 2024 in Detritus
Verified
Journal Article
Closed access
GCGiampaolo Cortellazzo
Giampaolo Cortellazzo
FBFrancesco Benedetti
Francesco Benedetti
SBStefano Busana
Stefano Busana
MFMarco Favaretti
Marco Favaretti
The aim of this study is to evaluate whether the Guelph permeameter can be effectively used as a quick and reliable instrument to measure the hydraulic conductivity of compacted mineral liners. The investigation was carried out on two distinct areas of the final capping of a municipal solid waste landfill in Italy. On the first test site, hydraulic conductivity tests were performed using the Guelph permeameter, assessing reliability and repeatability of test results. On the second one, many undisturbed soil samples were taken and tested in the laboratory using a modified oedometric apparatus as a falling-head permeameter. Further hydraulic conductivity tests with Guelph permeameter were also performed in the holes made by soil sampling. The campaign was integrated with in situ density tests using the calibrated sand method, to check the uniformity of the compaction degree of liners. A final comparison between hydraulic conductivity obtained in situ and in the laboratory was proposed and critically analysed. The experiments performed on the two test sites with the Guelph permeameter and their statistical processing demonstrate that the instrument is not only economical and easy to use, but also reliable if used with appropriate precautions.

19 October 2020 in International Journal of Geosynthetics and Ground Engineering
Verified
Journal Article
Open access
PDF file
GCG. Cortellazzo
G. Cortellazzo
MMMaria Clorinda Mandaglio
Maria Clorinda Mandaglio
SBS. Busana
S. Busana
MFM. Favaretti
M. Favaretti
Nicola MoraciNicola Moraci
Nicola Moraci
Design parameters typically used for the mineral liner of landfill cover system (e.g. water contentw, dry densityρdand hydraulic conductivityk) are often difficult to obtain on site. After construction, these experimental parameters need to be checked against the predicted values. In this paper, a rigorous procedure for design, construction and control of a compacted mineral liner in a capping multilayer system has been developed. The procedure has been schematically subdivided in three phases. The first phase (design) was based on a wide preliminary set of laboratory tests, composed of classification, compaction and permeability tests. An analytical relationship among degree of saturationSr, dry densityρdand hydraulic conductivitykis also defined. The second phase (construction) was developed through a suitable compaction of the mineral liner planned after the design phase. The last phase (in-site control) consists of checking the design parameters (w,Sr,ρd,k) actually achieved on site. A comparison between coefficientsk, obtained through site permeability tests and an analytical relationship obtained in the design phase, was made successfully. Owing to this new approach, it will no longer be necessary to perform in situ permeability tests, but it will be enough to define the above-mentioned analytical relationship during the design phase. In this way, a dangerous damage to the mineral liner, caused by the execution of invasive permeability tests, will be also avoided.