1 February 2020 in Measurement
RPRogério Santana Peruchi
LBLincoln Cardoso Brandão
1 August 2023 in International Journal of Quality & Reliability Management
KSKleber Roberto da Silva Santos
Kleber Roberto da Silva Santos
Purpose: This study investigates the repetitive mixed sampling (MRS) plan based on the Cpk index that was proposed by Aslam et al. (2013a). They were the first to study the MRS plan, but they did not pay attention to the fact that submitting to the variable inspection a sample that was first submitted to the attribute inspection, truncates the X observations. In addition, they did not work with an accurate expression to calculate the probabilities of the Cpk statistic.Design/methodology/approach: The authors presented the results based on their original sampling plan through Monte Carlo simulation and defined the theoretical results of their plan when the sample submitted to the variable inspection is no longer the same one submitted to the attribute inspection.Findings: The β risks of the optimum sampling plans presented by Aslam et al. (2013a) are pretty high, exceeding 46%, on average – this same problem was also observed in Saminathan and Mahalingam (2018), Balamurali (2020) and Balamurali et al. (2020), where the β risks of their proposed sampling plans are yet higher.Originality/value: In terms of originality, the authors can declare the following. It is not a big deal to propose new sampling plans, if one does not know how to obtain their properties. The miscalculations of the sampling plans risks are dangerous; imagine the situation where the acceptance of bad lots exceeds 50% just because the sampling plan was incorrectly designed. Yes, it is a big deal to warn that this type of problem is arising in a growing number of papers. The authors of this study are the pioneers to discover that many studies focusing on the sampling plans need to be urgently revised.
1 February 2022 in International Journal of Cardiovascular Sciences
Background: Due to the growing concern about work-related social and health aspects, occupational health and safety has become relevant. Objective: This work aims to develop a model to assist cardiovascular risk management in a team of haul truck operators, who work in rotating shifts at a mining company in Brazil. Methods: This longitudinal study evaluated risk factors for cardiovascular diseases of 191 mineworkers at three times points – 2010, 2012, and 2015. In addition, the risk of developing cardiovascular [...] Abstract Background: Due to the growing concern about work-related social and health aspects, occupational health and safety has become relevant. Objective: This work aims to develop a model to assist cardiovascular risk management in a team of haul truck operators, who work in rotating shifts at a mining company in Brazil. Methods: This longitudinal study evaluated risk factors for cardiovascular diseases of 191 mineworkers at three times points – 2010, 2012, and 2015. In addition, the risk of developing cardiovascular
1 September 2026 in International Journal of Industrial Engineering and Management
This study aims to investigate how the implementation of an automated traceability system facilitates the transition from Industry 4.0 (I4.0) to Industry 5.0 (I5.0) in a medium-sized Brazilian company. A qualitative single case study approach was employed, involving the application and development of the traceability system through barcode reading on stainless steel capacitor tanks, the RAST 4.0 system. The analysis focuses on the contribution of the RAST 4.0 system, which incorporates I4.0 technologies, to production efficiency and product quality, while also fostering more sustainable and human-centered industrial practices. Focus groups, documentary analysis and direct observations were utilized to collect data, thereby enabling a deeper understanding of the system’s implementation. The system provided improved control through real-time information, enabling informed decisions for continuous improvement and management of non-conformities in production. In addition, it was possible to achieve the three pillars of I5.0 and propose a conceptual model. The results of this study may encourage other companies looking to adapt to I5.0 to invest in similar systems to improve their processes, resulting in a more humane, productive, and sustainable work environment.
29 July 2025 in Quality Engineering