Ibrahim Olawale Muritala

Ibrahim Olawale Muritala

Auto-generated profile, based on publicly available information

Ibrahim Olawale Muritala

Ahmadu Bello University, Zaria

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
28 August 2024 in Franklin Open
Verified
Journal Article
Open access
HAHauwau Abdulrahman Aliyu
Hauwau Abdulrahman Aliyu
IMIbrahim Olawale Muritala
Ibrahim Olawale Muritala
HBHabeeb Bello-Salau
Habeeb Bello-Salau
SMSalisu Mohammed
Salisu Mohammed
Adeiza James OnumanyiAdeiza James Onumanyi
Adeiza James Onumanyi
OAOre-Ofe Ajayi
Ore-Ofe Ajayi

9 September 2023 in Franklin Open
Verified
Journal Article
Open access
IMIbrahim Olawale Muritala
Ibrahim Olawale Muritala
HBHabeeb Bello-Salau
Habeeb Bello-Salau
ASAhmed T. Salawudeen
Ahmed T. Salawudeen
SMSalisu Mohammed
Salisu Mohammed

21 January 2024 in Franklin Open
Verified
Journal Article
Open access
IMIbrahim Olawale Muritala
Ibrahim Olawale Muritala
MMMuhammed B. Mu'AZu
Muhammed B. Mu'AZu
ASAhmed T. Salawudeen
Ahmed T. Salawudeen
IUImeh J. Umoh
Imeh J. Umoh
HBHabeeb Bello-Salau
Habeeb Bello-Salau
SMSalisu Mohammed
Salisu Mohammed

9 August 2018 in Kinetik: Game Technology, Information System, Computer Network, Computing, Electronics, and Control
Verified
Journal Article
Open access
IMIbrahim Olawale Muritala
Ibrahim Olawale Muritala
MMMuhammed Bashir Mu'azu
Muhammed Bashir Mu'azu
EAE A Adedokun
E A Adedokun
This paper presents a MATLAB simulator of a three area interconnected power system of Thermal-Gas-Hydro. Nonlinearities intrinsic in the interconnected power system of communication delay, Generation Rate Constraint and Generation Dead Band were measured. Bat Inspired Algorithm was exploited to select the favourable parameters of the Model Predictive Controller and the Super Conducting Magnetic Energy Storage. Model Predictive Controller was the subordinate controller employed to minimalize the Area Control Error, Super Conducting Magnetic Energy Storage was the energy buffer to balance the load demand and the power generated. Integral Time Absolute Error was the performance metrics employed to minimize the Area Control Error. Parametric dissimilarity was tested on the inter-connected power system to observe the efficacy of the controller. Step load perturbation of was concurrently applied to the three-area inter-connected network, was introduced to the thermal generating unit, was introduced to the gas and hydro generating unit. Value of the tie-line was introduced to examine its effect on the frequency deviation. The results performed better when compared with Model Predictive Controller joined with Super Conducting Magnetic Energy Storage against the Model Predictive Controller without Super Conducting Magnetic Energy Storage in relations to settling time, overshoot and undershoot.