Jian Gang Jin

Jian Gang Jin

Auto-generated profile, based on publicly available information

Jian Gang Jin

School of Ocean and Civil Engineering, Shanghai Jiao Tong University, Shanghai, PR China

Research Focus & Metrics

Academic Career Length

16Years (2011-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 March 2014 in Transportation Research Part E: Logistics and Transportation Review
Verified
Journal Article
Closed access
JJJian Gang Jin
Jian Gang Jin
LTLoon Ching Tang
Loon Ching Tang
LSLijun Sun
Lijun Sun
Lee Der-HorngLee Der-Horng
Lee Der-Horng

1 September 2014 in Transportation Research Part C: Emerging Technologies
Verified
Journal Article
Closed access
LSLijun Sun
Lijun Sun
JJJian Gang Jin
Jian Gang Jin
Lee Der-HorngLee Der-Horng
Lee Der-Horng
KAKay W. Axhausen
Kay W. Axhausen
AEAlexander Erath
Alexander Erath

1 August 2016 in Transportation Science
Verified
Journal Article
Closed access
JJJian Gang Jin
Jian Gang Jin
KTKwong Meng Teo
Kwong Meng Teo
AOAmedeo R. Odoni
Amedeo R. Odoni
With growing dependence of many cities on urban mass transit, even limited disruptions of public transportation networks can lead to widespread confusion and significant productivity losses. A need exists for systematic approaches to developing efficient responses to minimize such negative impacts. We present an optimization-based approach that responds to degradations of urban transit rail networks by introducing smartly designed bus bridging services that take into consideration commuter travel demand at the time of the disruption. The approach consists of three fundamental steps, namely, (1) a column generation procedure to dynamically generate demand-responsive candidate bus routes, (2) a path-based multicommodity network flow model to identify the most effective combination of these candidate bus routes, and (3) another optimization-based procedure to determine simultaneously the optimal allocation of available vehicle resources among the selected routes and corresponding headways. The approach is applied to two case studies defined using actual data. The results show that the proposed approach can be carried out efficiently and that adding nonintuitive bus routes to the standard bus bridging services can significantly reduce the average travel delay. Moreover, the approach distributes delay more equitably. Many realistic operating constraints can also be handled.

1 March 2015 in Transportation Research Part C: Emerging Technologies
Verified
Journal Article
Closed access
LSLijun Sun
Lijun Sun
YLYang Lu
Yang Lu
JJJian Gang Jin
Jian Gang Jin
Lee Der-HorngLee Der-Horng
Lee Der-Horng
KAKay W. Axhausen
Kay W. Axhausen

1 January 2015 in Transportation Research Part E: Logistics and Transportation Review
Verified
Journal Article
Closed access
JJJian Gang Jin
Jian Gang Jin
Lee Der-HorngLee Der-Horng
Lee Der-Horng
HHHao Hu
Hao Hu

1 June 2017 in Computer-Aided Civil and Infrastructure Engineering
Verified
Journal Article
Open access
PDF file
JYJingfeng Yang
Jingfeng Yang
JJJian Gang Jin
Jian Gang Jin
JWJianjun Wu
Jianjun Wu
XJXi Jiang
Xi Jiang
Oversaturated conditions are often observed during peak-hour periods, especially for commuting metro lines serving as a corridor connecting suburb and urban areas due to its unidirectional passenger flow pattern. System operators are concerned about the amount of passengers accumulated inside station and at platform when train service cannot meet the travel demand. In this article, we tackle the metro system congestion issue and develop a compound strategy integrating passenger flow control and bus-bridging service, to mitigate overcrowded situation. A two-stage mathematical modeling procedure is proposed. Stage 1 determines the stations and time periods for taking passenger flow control strategy. Stage 2 identifies the optimal bus-bridging services. Mixed integer linear programming models are developed to find the demand-responsive flow control pattern and bus-bridging services. The proposed passenger flow control and bus-bridging strategy is applied to a commuting metro line in Shanghai. The results show that the proposed strategy is effective in reducing the number of stranded passengers, releasing the overcrowding pressure, and improving passengers’ satisfaction.