Mohamed Al-Hussein

Mohamed Al-Hussein

Auto-generated profile, based on publicly available information

Mohamed Al-Hussein

Univ. of Alberta

Research Focus & Metrics

Academic Career Length

22Years (2005-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 May 2019 in Automation in Construction
Verified
Journal Article
Closed access
Xianfei YinXianfei Yin
Xianfei Yin
Hexu LiuHexu Liu
Hexu Liu
YCYuan Chen
Yuan Chen
MAMohamed Al-Hussein
Mohamed Al-Hussein

1 May 2015 in Automation in Construction
Verified
Journal Article
Closed access
Hexu LiuHexu Liu
Hexu Liu
MAMohamed Al-Hussein
Mohamed Al-Hussein
MLMing Lu
Ming Lu

1 January 2018 in Automation in Construction
Verified
Journal Article
Closed access
MAMohammed Sadiq Altaf
Mohammed Sadiq Altaf
ABAhmed Bouferguene
Ahmed Bouferguene
Hexu LiuHexu Liu
Hexu Liu
MAMohamed Al-Hussein
Mohamed Al-Hussein
HYHaitao Yu
Haitao Yu

1 April 2016 in Advanced Engineering Informatics
Verified
Journal Article
Closed access
Hexu LiuHexu Liu
Hexu Liu
MLMing Lu
Ming Lu
MAMohamed Al-Hussein
Mohamed Al-Hussein

1 January 2019 in Automation in Construction
Verified
Journal Article
Closed access
PMPablo Martinez
Pablo Martinez
RARafiq Ahmad
Rafiq Ahmad
MAMohamed Al-Hussein
Mohamed Al-Hussein

1 September 2020 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
PDF file
YZYouyi Zhang
Youyi Zhang
ZLZhen Lei
Zhen Lei
SHSangHyeok Han
SangHyeok Han
ABAhmed Bouferguene
Ahmed Bouferguene
MAMohamed Al-Hussein
Mohamed Al-Hussein
The construction industry has strived for higher productivity in the last several decades, which has resulted in innovations and improvements, including methodologies, tools, and machines. By moving work from on-site to off-site, the objective is to use the workforce and machinery in a controlled environment without external interference for higher productivity and quality. However, the construction manufacturing domain may not benefit fully from modular construction and lean implementation when employing the stick-built under a roof method, which follows a similar construction process as the conventional on-site construction approach. This paper introduces a process-oriented framework which integrates value stream mapping (VSM) with a production line breakdown structure (PBS) to analyze current production line performance using key performance indicators (KPIs), assess the proposed solution for improved performance, and visualize the future implementation of the proposed solution on a construction manufacturing production line.