18 September 2017 in Engineering, Construction and Architectural Management
Purpose: Construction project delays are described as a universal problem, which has led to many empirical studies. However, most of these studies were based on the rankings by respondents, and they were rarely verified. Therefore, the purpose of this paper is to explore professional perspectives on the causes of delay in the construction industry, where there has been little explicit consideration on this subject in recent decades.Design/methodology/approach: A critical literature review and a qualitative approach was considered for a deeper and fresh understanding of the causes of delays, rather than recycling the existing themes and the risk of a statistically biased approach. A total of 41 interviews were undertaken which included the London Olympic 2012 project team.Findings: In all, 32 themes were identified, which were categorised into 15 categories of causes of delay in the construction projects. Almost two-thirds of the main themes are not ranked top 15 causes of delay. These include knowledge and competence shortage, poor commercial decisions, unnecessary health and safety restrictions, poor risk management and poor space and logistics management.Research limitations/implications: Due to the qualitative nature of the study, the findings might not be considered as representative.Practical implications: The findings provide consideration of the causes of delay in the construction industry as seen by practitioners, which should provide guidance to enhance performance.Originality/value: The study contributes to the better understanding of the causes of delays by using qualitative research strategy which is limited in the construction management literature. This study is an empirical investigation into the causes of delay in the twenty-first century and it represents an important edition to the body of knowledge within the subject area.
2 November 2012 in Structural Survey
Purpose: The paper is conceptual in nature and explores the role and function of project management in the achievement of sustainability in the built environment by developing a 4Es (Economic, Effectiveness, Efficiency and Ethics) and 4 Poles (Economic, Social, Environmental and Technology) model of sustainability. The study also identifies that the existing debates on sustainability seem to marginalise project management's positive contributions to sustainable construction, as well as the importance of technology in the sustainability agenda.Design/methodology/approach: The paper consists of a literature review on the concept of sustainability, the contribution of the built environment to the sustainability problem, and an intellectual discussion of a proposed model for achieving sustainable development in the built environment. The body of this paper is divided into three sections: part one reviews “what is sustainability”, part two discusses the current state of sustainability including the importance of technology, and part three discusses the 4Es and 4 Poles model.Findings: This research establishes the importance of technology in the sustainable development agenda. The paper proposes a 4Es (project management model) and 4 Poles (poles or factors of sustainability) model as a holistic approach to achieving sustainable construction. In addition, this paper proposes an extension to the definition of sustainable construction or development, as the existing definitions seem to be vague.Research limitations/implications: This research paper focuses only on sustainability in the built environment and sustainable development with reference to project management.Practical implications: The proposed model uses a project management approach, which does not allow trade‐offs, but promotes integration of the 4 Poles. This will contribute to the achievement of sustainable construction at every level of a project or organisation.Originality/value: The proposed model is new within project management and the built environment. It also promotes technology as a core factor in achieving sustainable development.
3 September 2019 in International Journal of Construction Management
The study examines the degree of accuracy and factors that influence the uncertainty of cost estimates. A critical review of literature conducted and was followed with two SMEs case studies executing four projects for different clients. The data collection methods used were documental review, observations and interviews. A total of 12 interviews were conducted and analysed using qualitative thematic analysis. The findings reveal an unquantifiable average cost drift or inflated risks of 19% in cost estimates which is significant as compared to other studies. Ten main factors were identified as the influential factors to the uncertainty of cost estimates, which included type of client, terms and conditions of payments, availability of cost information, experience, repeated work and guarantee of the job. This study contributes to existing literature and it reveals that in the UK post-2008 era, cost of construction remains higher and it could be reduced.
9 November 2012 in Engineering, Construction and Architectural Management
Purpose: This paper aims to examine the extent of productivity losses in smoking breaks on construction sites.Design/methodology/approach: The smoking behaviours of workers in a small/medium‐sized construction company were examined for a period of four months. Construction workers were targeted due to their higher prevalence in smoking. The exact time losses through smoking breaks were measured and calculated. The productivity losses were then evaluated and compared with the estimates of productivity losses and wage penalties found in the literature.Findings: It is found that a smoker on average smokes 5.6 cigarettes, which takes a total of 73 minutes, representing 15.2 per cent of productivity loss in an eight‐hour shift. This productivity loss is much higher than productivity losses through increased sick leaves or the wage penalties for smokers found in the literature.Research limitations/implications: Variations of smoking behaviours throughout the year have not been considered. The study has focused on a renovation and rehabilitation project, it has not considered the workers from other trades who might have different smoking behaviours.Originality/value: This paper is a contribution to the limited literature on the productive time losses through smoking breaks. Most studies on productive time loss attributable to smoking focused on the additional sick leaves taken by the smokers, without realizing that productive time losses through smoking breaks far exceeds those additional sick leaves.
30 March 2026 in Buildings and Cities