In this paper, a sparse representation-based intuitionistic fuzzy clustering (SRIFC) approach is presented for solving the large-scale decision making (LSDM) problem. It consists of two algorithms: the sparse representation-based intuitionistic fuzzy clustering-exactly precision (SRIFC-E) algorithm (which is presented for an exactly precision requirement), and the sparse representation-based intuitionistic fuzzy clustering-soft precision and scalable (SRIFC-S) algorithm (which is proposed for soft precision and scalable requirements). In the proposed SRIFC approach, decision makers are clustered into several interest groups according to their interest preferences and relation sparsity in their intuitionistic fuzzy assessment information. The main contribution of the presented SRIFC approach is to investigate the group intra-relations among DMs and to detect the group leaders for each interest group during the clustering process. According to the illustrative experiment results, the presented SRIFC approach is an adaptive and unsupervised clustering method and presents more robust and efficient for LSDM problems.
1 January 2016 in KSCE Journal of Civil Engineering
China’s construction industry has constantly been confronted with the problems, such as high resource consumption, serious pollution and low energy efficiency. Thus, improving the energy efficiency of the construction industry and reducing its energy consumption can not only promote the sustainable development of the socio-economy and eco-economy, but also enhance the overall development level of the construction industry. In the context, the objectives are to put forward a set of systematic methodologies for measuring the energy efficiency of the regional construction industry and analyzing its change trends. First, the energy efficiency index system of the construction industry and its influencing factors are constructed through the literature review. Second, two research methods (the three-stage Data Envelopment Analysis (DEA) model and the Data Envelopment Analysis-Discriminant Analysis (DEA-DA) model) are applied to analyze the energy efficiency in 30 provinces of China and the change trends from 2003 to 2011. The results indicate that after eliminating the influence of the environment factors and random errors, the energy efficiency values of the construction industry in most of the provinces were improved. The mean of China’s energy efficiency of the construction industry in each year was approximately 0.92. Except Shandong with the lowest values, the mean of the other provinces was over 0.8, which reflected that the energy management and utilization levels in the construction industry were relative mature. However, the energy efficiency in most of provinces fluctuated constantly during these nine years, with the peak in 2004 and a downward trend in the overall efficiency after 2004. From the regional aspect, the energy efficiency of the construction industry in the eastern, central and western regions decreased successively; as the development level of the local economy had less significant effects on the energy efficiency, the gaps among the three regions were not obvious.
With the development of social democracy, the public begin to participate in large-scale group decision making (LSGDM) events that have a significant impact on their personal interests. However, the participation of the public with insufficient expertise will cause much hesitancy in the evaluations of decision makers (DMs), which can be captured by intuitionistic fuzzy sets. Meanwhile, due to the increment in the number of DMs, the cost of consensus reaching processes (CRPs), which are utilized to help DMs reach a consensus, is getting higher and higher. In order to improve the efficiency of the CRP, this paper presents a confidence and conflict-based consensus reaching process (CC-CRP) for LSGDM events with intuitionistic fuzzy representations. In the proposed model, according to the hesitancy of the DMs’ intuitionistic fuzzy evaluations, an objective method is firstly developed to calculate the confidence level of DMs that does not require any extra information. Then, a three-dimension clustering method is designed by considering the type of conflict, the degree of conflict, and the confidence level of DMs. After this, an efficiency rate of modification is defined to select DMs who will be persuaded first to adjust their evaluations with recommendation plans generated by a specific optimal method. Finally, according to the clustering process results, different CC-CRP management methods will apply to DMs with different attributes. An illustrative example and several experiments are reported to provide evidence that the proposed model is feasible and effective.
6 February 2017 in Journal of Engineering, Design and Technology
Purpose: Previous research has little specific guidance on how to improve large infrastructures’ risk analysis. This paper aims to propose a practical risk analysis framework across the project lifecycle with Bayesian Networks (BNs).Design/methodology/approach: The framework includes three phases. In the qualitative phase, primary risks were identified by literature reviews and interviews; questionnaires were used to determine key risks at each project stage and causal relationships between stage-related risks. In the quantitation, brainstorming and questionnaires, and techniques of ranked nodes/paths, risk map and Bayesian truth serum were adopted. Then, a BN-based risk assessment model was developed, and risk analysis was conducted with AgenaRisk software.Findings: Twenty key risks across the lifecycle were determined: some risks were recurring and different risks emerged at various stages with the construction and feasibility most risky. Results showed that previous stages’ risks significantly amplified subsequent stages’ risks. Based on the causality of stage-related risks, a qualitative model was easily constructed. Ranked nodes/paths facilitated the quantification by requiring less statistical knowledge and fewer parameters than traditional BNs. As articulated by a case, this model yielded very simple and easy-to-understand representations of risks and risk propagation pathways.Originality/value: Rare research has developed a BN risk assessment model from the perspective of project stages. A structured model, a propagation network among individual risks, stage-related risks, and the final adverse consequence, has been designed. This research provides practitioners with a realistic risk assessment approach and further understanding of dynamic and stage-related risks throughout large infrastructures’ lifecycle. The framework can be modified and used in other real-world risk analysis where risks are complex and develop in stages.
Sustainable development has been commonly identified as a vital target in the construction industry. Studies have examined different management strategies and procedures to promote resource utilization efficiency, while the human factors in sustainable construction have received far less attention. This paper investigates the influence of Project Citizenship Behavior (PCB) on project performance in the sustainable construction context. After introducing the concept of “relationship sustainability,” a moderating model is established. Data are collected from 152 experienced construction project managers in China. The results show positive relationships between most dimensions of Project Citizenship Behavior and construction sustainability performance, in spite of the negative effect of taking charge on relationship sustainability. Moreover, the degree of complexity of projects acts as a moderator in the relationship between Project Citizenship Behavior and construction sustainability performance. This paper endeavors to enrich the knowledge of sustainable construction by regarding human behavioral factors as important resources and explaining their effect on project sustainability, thus shedding light on the theory of sustainable construction by extending it to the micro-level analysis, as well as offering guidelines about how to raise the sustainability level of construction projects.