6 August 2023 in Structures
4 January 2024 in Bulletin of Earthquake Engineering
1 January 2026 in Canadian Journal of Civil Engineering
The 2023 Kahramanmaras earthquakes highlighted the urgency of assessing and intervening in old, seismically deficient buildings. However, not all old buildings collapse during earthquakes despite noncompliance with current codes. Prioritizing buildings based on seismic risk offers a reasonable approach. This study analyzed 17 242 1–10 story pre-2000 RC buildings in Kahramanmaras, considering factors such as soil conditions, number of stories, construction year, fault proximity, and seismic demand, and their effects on structural damage distribution. Risk class distributions of these buildings are estimated by a pre-earthquake regional seismic risk estimation methodology developed based on the outcomes of performance-based rapid seismic risk assessment of pre-2000 buildings in Istanbul using PERA2019 methodology, and compared with actual earthquake damage. Results showed a strong correlation between “very high risk” buildings and those heavily damaged or collapsed. Finally, based on the results, a regional-scale prioritization strategy was proposed to efficiently identify high-risk buildings prone to excessive damage.
17 January 2023 in Research Square
Most of the buildings in Turkey constructed before 1999 Kocaeli and Duzce Earthquakes do not have sufficient seismic resistance due to construction errors and do not satisfy the recent Turkish Building Earthquake Code (2018) or its preceding versions. In Istanbul, the ratio of buildings constructed before 2000 is nearly 70% in building stock. Clearly, seismic safety assessment of huge number of buildings is not practically possible by code-based detailed assessment approaches, which generally assess the seismic performance of buildings in terms of pass or fail, rather than rank and classify/prioritize these buildings considering their seismic safety. Moreover, the probability of a catastrophic earthquake that could hit Istanbul is high. Therefore, to minimize casualties and economic losses, it is important to determine the most vulnerable existing buildings effectively in terms of cost and duration. Accordingly, Istanbul Metropolitan Municipality has started to evaluate the seismic safety of existing reinforced concrete buildings using the PERA2019 method considering the actual structural data collected on site. The buildings are then divided into 5 seismic risk classes from low-risk to very highrisk according to the computed seismic safety ratio. In this study, the reliability of the PERA2019 is evaluated by considering the predicted risk classes of another large group of actual buildings that have been subjected to actual earthquakes and experienced earthquakeinduced damages in different extents. The comparative evaluation of actual seismic damages and predictions of PERA2019 showed clearly that the methodology has a sound ability to estimate the structural seismic performance of the investigated buildings.