Ziqing Liu

Ziqing Liu

Auto-generated profile, based on publicly available information

Ziqing Liu

Key Laboratory of Concrete and Prestressed Concrete Structures of Ministry of Education, Southeast University, Nanjing, China

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
29 December 2022 in Advances in Structural Engineering
Verified
Journal Article
Closed access
ZLZiqing Liu
Ziqing Liu
Zhiqiang DongZhiqiang Dong
Zhiqiang Dong
HZHong Zhu
Hong Zhu
GWG. Wu
G. Wu
YWYuhua Wen
Yuhua Wen
A new type of large-diameter iron-based shape memory alloy (Fe-SMA) stranded wire was developed, and its stress recovery behaviour was experimentally investigated in this study. The produced Fe-SMA stranded wires had a diameter of 15.2 mm, which were the same as the most commonly used steel-stranded wires. This kind of large-diameter Fe-SMA stranded wire matched the existing prestressed anchorage system to reduce application cost and accelerate the field application of the Fe-SMA in civil engineering. The effects of prestrain levels (4%, 6%, 8%, 10%), activation temperatures (200°C, 300°C, 400°C, 500°C), and secondary activation effect on the recovery stress of Fe-SMA stranded wires were analysed. Test results showed that the recovery stresses of the Fe-SMA stranded wire were 223–357 MPa. The maximum recovery stress was measured for the specimen with a prestrain of 8% and an activation temperature of 500°C. With increasing activation temperature, the recovery stress increased, but the increment decreased gradually. An increased prestrain level resulted in a first increase and a second decrease in the recovery stress, which was highest at the 8% prestrain level. If the shape memory effect (SME) was not fully used during the first activation, then the remaining martensitic phase changed on the second activation. The recovery stress generated by the first activation was essentially the same as those generated by the second activation at the same activation temperature. Taking the Nanshao River concrete box girder bridge in China as an example, the effect of using Fe-SMA stranded wires to compensate the prestressing loss was calculated. The results showed that the Fe-SMA stranded wire developed was able to compensate the vertical prestress loss of the prestressed box girder bridge web well and maintain the main tensile stresses at a low level during the service life of the bridge.

23 March 2022 in Advances in Structural Engineering
Verified
Journal Article
Closed access
ZDZhiqiang Dong
Zhiqiang Dong
ZLZiqing Liu
Ziqing Liu
GWG. Wu
G. Wu
HZHong Zhu
Hong Zhu
FLFei Lu
Fei Lu
XSXinXing Shao
XinXing Shao
In this paper, a novel arch-shaped BFRP tube with longitudinal BFRP bars pre-bonded on the inner wall is proposed and fabricated. It can provide strength in both circumferential and longitudinal directions and is suitable for the rapid construction of arch bridges in island environments by filling with seawater sea-sand coral aggregate concrete (SWCC) in situ. Ten SWCC-filled BFRP tubular arches were fabricated and tested under monotonic loading. Test variables include the wall thickness of the BFRP tube, the radius angles of the arch, and with or without pre-bonded BFRP bars. Test results showed that the failure modes of arches without BFRP bars were bending failure under the loading point. The ultimate bearing capacities were increased by 33.1% and 71.7% as the wall thickness increased from 2 mm to 3 mm and 4 mm, respectively. The failure modes of arches containing pre-bonded BFRP bars were bending-shear failure close to the loading plate. The ultimate bearing capacity of arches, which containing BFRP bars, with a wall thickness of 2 mm, 3 mm, and 4 mm increased by 215%, 248%, and 189%, respectively, compared with the specimens without BFRP bars. The integrity and ultimate bearing capacities of arches decreased with the increase of the radius angle and their failure modes exhibited obvious brittle damage characteristics. The proposed new type of arch has good prospects for application in the marine environment.

15 February 2021 in Advances in Structural Engineering
Verified
Journal Article
Closed access
PDF file
YWYuzhuo Wang
Yuzhuo Wang
BZBingjie Zhang
Bingjie Zhang
ZLZiqing Liu
Ziqing Liu
YGYing Gao
Ying Gao
CFChuanguo Fu
Chuanguo Fu
This paper presents results from an experimental study on the effect of temperature on bond strength of I-shaped steel and concrete. Eleven concrete encased steel (CES) specimens were tested by home-made fire test furnace to evaluate bond strength at various constant high temperatures (20°C600°C). The test results showed that: (1) the trend of the bond-slip curves at high temperatures were much similar to that at room temperature. Compared with room temperature specimen, the ultimate bond load and the residual bond load of specimens at high temperatures were significantly decreased. The specimens with the higher temperature had the less ultimate bond load and residual bond load. (2) In the descending stage, the P-S curve of the specimens with higher temperatures had more flat slope. The P-S curve of the specimens at the temperatures higher than 250°C had invisible descending stage. The ultimate bond load of the specimen at 600°C left with only about 5% of that at room temperature. (3) The ultimate slippages (i.e. the slippage at the ultimate bond load) of specimens at high temperatures were larger than that at room temperature, and varied from 2 to 5 mm. (4) The calculation formulas of ultimate bond load, ultimate slippage, and residual bond load at different temperatures were presented, the constitutive equations of bond-slip at different temperatures were obtained, which will provide a reference for the fire-resistant design of concrete encased steel columns.

30 January 2026 in Advances in Structural Engineering
Verified
Journal Article
Closed access
Zhiqiang DongZhiqiang Dong
Zhiqiang Dong
LHLonglong Hu
Longlong Hu
ZLZiqing Liu
Ziqing Liu
XSXinliang Sun
Xinliang Sun
HZHong Zhu
Hong Zhu
YPYijie Pan
Yijie Pan
The excessive loss of vertical prestress is a primary factor contributing to web cracking in large-span prestressed concrete box girders. The self-prestressing characteristics of iron-based shape memory alloys (Fe-SMAs) after heat activation offer significant potential for the timely and efficient supplementation of vertical prestress loss. Therefore, the effects of stress supplementation introduced by the self-prestressing of Fe-SMA rebars were investigated using six scaled concrete plates. This analysis focuses on the influence of the vertical prestressing rebar type and spacing on the compressive stress field. The self-prestressing of the Fe-SMA rebars stabilized after approximately 4 h of Fe-SMA activation. Furthermore, unlike the conventional prestressing rebar, the self-prestressing of the Fe-SMA rebar was relatively uniformly distributed along its entire length. When both types of bars were positioned at the same position in separate specimens, the difference between the maximum and minimum values of stress on the specimen with only Fe-SMA rebars was only 6.98% of that in the specimen with only screw-threaded steel bars. Overall, by strategically and vertically equipping the web with Fe-SMA rebars, the vertical prestress loss of the box web can be effectively supplemented in a timely manner.

8 November 2026 in Journal of Bridge Engineering
Verified
Journal Article
Closed access
YSYu Sun
Yu Sun
ZLZiqing Liu
Ziqing Liu
HZHong Zhu
Hong Zhu
JLJiahang Li
Jiahang Li
Zhiqiang DongZhiqiang Dong
Zhiqiang Dong
Elyas GhafooriElyas Ghafoori
Elyas Ghafoori
This study proposes a novel bonded straight iron-based shape memory alloy (Fe-SMA) plate system using hybrid anchorage for the shear strengthening of reinforced concrete (RC) T-beams and presents a comprehensive experimental evaluation of its structural performance. Unlike existing Fe-SMA shear-strengthening configurations that rely on mechanically complex anchorage or exhibit limited prestress transfer, the proposed hybrid-anchored configuration enables the reliable application of active prestressing without hydraulic anchorages while allowing flexible vertical or diagonal strengthening layouts. Fifteen specimens were tested under three-point bending to evaluate the effects of shear-span ratio ( λ = 1.0, 1.5, 2.0), activation temperature (150°C, 250°C), Fe-SMA inclination angle ( β = 90°, 45°), and bonding condition. The results demonstrate that the proposed system significantly improves the shear behavior of RC T-beams. Compared with unstrengthened specimens, activated Fe-SMA plates increased the maximum shear capacity by up to 43%, reduced internal stirrup stress, and enhanced postcracking stiffness by approximately 30%. The system also significantly improved crack-control performance, reducing the maximum diagonal crack width by more than 60% and increasing the initial cracking shear force by up to 116%, which effectively delayed crack propagation and mitigated brittle failure. Diagonal strengthening ( β = 45°), oriented perpendicular to the principal tensile stress direction, produced more uniform crack distributions and superior confinement. Bonded configurations provided additional advantages, ensuring a more uniform transfer of self-prestress and achieving shear capacity increases up to three times greater than those in unbonded specimens. The theoretical values closely matched the experimental results, confirming that the contribution of the activated Fe-SMA exceeded that of the stirrups by more than a factor of 2. Overall, the proposed bonded Fe-SMA strengthening system offers active crack control, substantial shear performance enhancement, and ease of installation, providing a practical and durable solution for upgrading existing concrete bridges and structural members.