1 March 2020 in Automation in Construction
Verified
Journal Article
Closed access
ZWZhaojing Wang
Zhaojing Wang
TWTengyu Wang
Tengyu Wang
HHHao Hu
Hao Hu
JGJie Gong
Jie Gong
XRXu Ren
Xu Ren
QXQiying Xiao
Qiying Xiao

1 February 2018 in Automation in Construction
Verified
Journal Article
Closed access
ZWZhaojing Wang
Zhaojing Wang
HHHao Hu
Hao Hu
JGJie Gong
Jie Gong

1 September 2019 in Journal of Cleaner Production
Verified
Journal Article
Closed access
ZWZhaojing Wang
Zhaojing Wang
HHHao Hu
Hao Hu
JGJie Gong
Jie Gong
XMXiaoping Ma
Xiaoping Ma
WXWuyue Xiong
Wuyue Xiong

1 July 2017 in Journal of Computing in Civil Engineering
Verified
Journal Article
Closed access
ZWZhaojing Wang
Zhaojing Wang
HHHao Hu
Hao Hu
Production scheduling plays a key role in the prefabricated construction productivity and on-time delivery of precast components (PCs). However, the processes before and after the production of PCs were ignored in previous scheduling studies. These operations account for a large proportion of the PCs’ processing time in practice. To ensure the accurate calculation of PC’s completion time and its on-time delivery, this study integrates the mold manufacturing, PC storing, and transportation processes to modify the traditional production-scheduling model from the perspective of the whole PC supply chain. Further, the three scenarios of daytime, night, and all-day transportation are analyzed to conform to the practice. Based on the genetic algorithm, two case studies are conducted to test the validity of the proposed scheduling model. The modified schedule could achieve 17.7, 35.7, and 15.4% cost savings in the three scenarios, respectively. The methodology will enhance the feasible production scheduling and promote on-time delivery of PCs.

1 October 2019 in Transportation Research Part D: Transport and Environment
Verified
Journal Article
Closed access
LDLei Dai
Lei Dai
HHHao Hu
Hao Hu
ZWZhaojing Wang
Zhaojing Wang
YSYifan Shi
Yifan Shi
WDWenyi Ding
Wenyi Ding

1 June 2017 in Computer-Aided Civil and Infrastructure Engineering
Verified
Journal Article
Open access
PDF file
ZWZhaojing Wang
Zhaojing Wang
HHHao Hu
Hao Hu
WZWei Zhou
Wei Zhou
Radio frequency identification (RFID) helps improve supply chain efficiency by providing item-level identification and real-time information. Today, barcode continues to be the main identification technology for precast construction applications. In this research, we investigate the data-driven mechanisms and benefits of utilizing RFID in knowledge-based precast construction supply chains. With computer-aided self-learning capability, we simulate three models for manual-, barcode-, and RFID-enabled precast construction supply chain. The results of 100 precast wall-panel construction in a two-echelon precast construction supply chain reveal that the knowledge-based RFID system could generate 62.0% saving of operational costs, which is 29.0% higher than that of a barcode-based system. As a result, the computer-aided adaptive learning mechanism based on RFID is verifiable to improve the overall operational performance by reducing lead time, operational errors, and costs. Due to the lack of existing literature of data technology utilization in the precast construction industry, our findings in this research could improve the decision making regarding technology selection, as well as help with the operationalization of RFID and transformation to intelligent precast construction management in big data environment.