With wind power penetration increasing, it is crucial to accurately estimate the impact of wind power generation on grid inertia levels. This article proposes a microgrid inertia estimation model with distributed wind power generation, considering the impact of wind conditions on doubly-fed induction generators (DFIG). The frequency response mechanisms of a DFIG-based wind turbine (WT) are investigated across different wind speed zones. A non-synchronous inertia matrix is formulated, accounting for the impact of varying wind speeds. A Multiple-Input Single-Output (MISO)-based identification method is proposed for identifying the elements of the inertia matrix. The simulation reveals that the wind speed affects the microgrid inertia response through the turbine speed control. The method can assess the risk of frequency issues and assist in the safe and stable operation of microgrids.
29 January 2024 in IEEE Transactions on Power Delivery
Resilience strategies prove effective in mitigating extreme weather impacts. Nevertheless, conventional approaches often neglect the fluctuation in security constraints for electrical equipment during such conditions. This paper introduces a resilience-enhancing model for distribution networks, explicitly addressing the repercussions of ice disasters on voltage and power flow security limits. By scrutinizing the influencing mechanisms of corona and icing flashover on voltage security limits and evaluating current carrying capacity on power flow security limits, a dynamic weights-based model for voltage security limits and a weather correction coefficients-based model for power flow security limits are presented. Simulation results on the modified IEEE 69 and 123-node test system substantiate the validity of the proposed methodology.
13 October 2025 in IEEE Transactions on Sustainable Energy
The uncertainty in planned reserve activation leads to uncertainty in the state of charge (SoC) of pumped-storage hydropower plants (PSHPs). Investigating this uncertainty in the unit commitment (UC) problem is worthwhile. This paper presents a UC model that incorporates uncertainty in SoC caused by uncertainty in the probability of planned reserve activation for PSHPs. A SoC constraint boundary estimation model for PSHPs is developed considering the uncertainty in the probability of planned reserve activation across all preceding periods. The model also considers the uncertainties arising from load fluctuations and unit outages. Furthermore, a hybrid interval robust optimization approach is introduced, which simultaneously considers both pessimistic and optimistic scenarios to mitigate the bias in SoC boundary estimation caused by sample errors in the proposed model. Simulations on a modified IEEE 118-bus system verify the effectiveness of the proposed UC model.