Yanming Yu

Yanming Yu

Auto-generated profile, based on publicly available information

Yanming Yu

Huadong Engineering Corporation Limited, Hangzhou 310014, China

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
7 September 2021 in Symmetry
Verified
Journal Article
Open access
PDF file
ZFZunan Fu
Zunan Fu
GWGuoshuai Wang
Guoshuai Wang
YYYanming Yu
Yanming Yu
LSLi Shi
Li Shi
The pile–bucket foundation that features a bucket slipped onto a monopile is a new type of symmetric offshore foundation supporting the wind turbine. Its load bearing and deformation resistance capacity are unclear, especially when subjected to cyclic horizontal loadings. In this paper, a model test has been designed and carried out for investigating the cyclic behavior of the pile–bucket foundation embedded in soft marine clay. Cyclic horizontal loads are applied in a displacement-controlled manner with different amplitudes and frequencies. The influences of cyclic loading parameters, including the amplitude, the frequency and the cycle number, have been studied from the perspectives of stiffness-degradation and damping effect that are evaluated from the recorded horizontal force–displacement relationships at the loading point. In addition, the influences of cyclic horizontal loading on the bending moment distribution and on the p–y curve have been presented and discussed. The results show that significant reductions in the foundation stiffness and in the soil resistance may be observed during the first few cycles when the loading displacement is relatively high.

27 September 2021 in Applied Sciences
Verified
Journal Article
Open access
PDF file
ZFZunan Fu
Zunan Fu
GWGuoshuai Wang
Guoshuai Wang
WSWenbo Song
Wenbo Song
YYYanming Yu
Yanming Yu
PWpengfei wei
pengfei wei
TWTingyu Wu
Tingyu Wu
Under long-term traffic loading, the soil elements in subgrade are subjected to continuous principal stress rotation. In order to study the deformation properties of soft clays under traffic loading with principal stress rotation, a series of cyclic torsional shear tests were conducted on Wenzhou soft clays under different torsional cyclic stress ratios and degrees of principal stress rotation. The test results showed the stiffness softening of soil under long-term traffic loading. In addition, the principal stress rotation induced by traffic loading aggravated the deformation of clay samples and pore pressure accumulation. A modified dynamic pore pressure model was applied to consider the effect of principal stress rotation on undrained cumulative pore pressure, predicting the growth of cumulative pore pressure at different cycles. Considering loading cycles and the principal stress rotation, a modified Hardin–Drnevich (H-D) backbone curve model under traffic loading with principal stress rotation was proposed, and the predictive values of this model agreed well with the experimental values. Compared with the traditional H–D model, this model better reflects the cyclic deformation of soft clays under long-term traffic loading with principal stress rotation.

10 March 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
KYKang Yao
Kang Yao
DCDa Cheng
Da Cheng
JSJunhui Sheng
Junhui Sheng
LSLi Shi
Li Shi
LHLijian Hu
Lijian Hu
YYYanming Yu
Yanming Yu
The air-booster vacuum preloading method has been applied to slurry ground improvement. It is based on the conventional vacuum preloading method but with an additional injection of pressurised air into the soil via pre-installed conductors. The drainage effect of air-booster vacuum preloading has been demonstrated by past studies; however, direct observations of the real-time behaviour of slurries subjected to boosted air remain lacking. This study used a combined monitoring technique that included particle image velocimetry, pore water/air pressure gauges, a vortex flowmeter and an electronic balance to conduct a laboratory test of air-booster vacuum consolidation of dredged slurry. The tests allowed analyses of (1) the real-time displacement field of the slurry, (2) the pressure–flux relationship of the pressurised air, and (3) the pore water pressure responses during air boosting. The first aspect allowed direct observation of small-crack initialisation and propagation during pressurisation; while the latter two confirmed the crack initiation based on drops in air and pore water pressures. The measured crack initiation pressure was verified by comparison with theoretical predictions. The results demonstrate that pressurised air induces cracks in soil, which promote the drainage consolidation of dredged slurry.

1 January 2021 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
YYYanming Yu
Yanming Yu
JSJunhui Sheng
Junhui Sheng
LSLi Shi
Li Shi
ZHZhijun Hu
Zhijun Hu
A field test was conducted on vacuum treatment effects of a dredged slurry ground considering three PVD spacing, i.e., 700, 800, and 900 mm. The settlement and the pore water pressure dissipation were measured during the treatment period. As expected, the consolidation rate associated with closer PVD spacing case is higher than that of the larger spacing case. However, it is observed that the final and stable values of the settlement and the pore pressure dissipation of the close spacing case (e.g., 700 mm) are about 17% higher than the case of larger PVD spacing (e.g., 900 mm). The differences imply that enlarging the PVD spacing not only impedes the consolidation rate but also decreases the vacuum pressure in slurry. Numerical models incorporating the vacuum pressure attenuation effect and the clogging effect were established to reproduce the vacuum treatment process under the three PVD spacing. Good comparisons between the numerical and test results can be obtained given a proper account of vacuum attenuation and the clogging effect along the PVD depth. The comparison clarifies that, for vacuum treatment of slurry ground, the PVD spacing should be determined by due considerations both on the desired consolidation rate and on the pore water pressure that needs to be dissipated.

18 October 2021 in Applied Sciences
Verified
Journal Article
Open access
PDF file
JWJiahao Wang
Jiahao Wang
ZFZunan Fu
Zunan Fu
YYYanming Yu
Yanming Yu
GWGuoshuai Wang
Guoshuai Wang
LSLi Shi
Li Shi
JHJie He
Jie He
The vacuum preloading method is commonly adopted for improving the soft ground that the embankment of the railway line is laid on. The PIV (Particle Image Velocimetry) technique is a powerful tool in observing the formation of the soil column, a phenomenon that is unique to the dredged slurry when treated by vacuum preloading. However, it is not clear to what extent the motions of the slurry particles can be represented by the PIV tracers. In this paper, a mesoscopic model has been established by using the CFD-DEM method to reproduce the vacuum consolidation process of the slurry, in which the PVD (Prefabricated Vertical Drain) membrane, the slurry particles, and the tracers are described by the DEM, and the pore water is governed by the CFD method. Eight computational cases that can cover a broad range of material parameters governing the PIV model tests on the dredged slurry have been designed and studied by the established model. The representativeness of the PIV tracer is evaluated by comparing the statistic displacement of the tracer to that of the slurry particles. It is found that for the commonly used tracer, the carbon powder, can reliably represent the particle motions of the slurry since the difference in displacements of the tracer and the slurry particles is smaller than 6.5% if the diameter ratio between the tracer and the slurry particle is within 1.8.

17 June 2023 in CLEAN – Soil, Air, Water
Verified
Journal Article
Closed access
CGChen Gu
Chen Gu
JSJiyan Shi
Jiyan Shi
YYYanming Yu
Yanming Yu
JRJianliang Rui
Jianliang Rui
WHWeibin Huang
Weibin Huang
CYChenghua Ye
Chenghua Ye