Peng Han

Peng Han

Auto-generated profile, based on publicly available information

Peng Han

School of Information Science and Engineering, Northeastern University, Shenyang 110819, China

Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
2 January 2014 in Mathematical Problems in Engineering
Verified
Journal Article
Open access
PDF file
PHPeng Han
Peng Han
JWJinkuan Wang
Jinkuan Wang
YHYinghua Han
Yinghua Han
YLYan Li
Yan Li
With the development of smart grid and the increase of global resident Plug‐In Electric Vehicle (PEV) market in the near future, the interaction between limited distribution grid capacity and uncontrollable PEV charging loads can lead to violations of local grid restrictions. And the proper model charging scheduling mechanism is the key to assess and satisfy various resident charging requirements and help in optimizing utility utilization. In this paper, the distribution grid profile model with PEV charging power is firstly constructed for the purpose of studying resident PEV charging impact on the distribution grid. To better reflect the actual impact of PEVs, we use real data on driving behaviors, vehicle characteristics, and electricity loads to generate our model. Furthermore, an improved queuing‐theory‐based scheduling mechanism is proposed, the distribution grid communication structure and the algorithm are illustrated, and computer simulations are demonstrated to verify their performance. The results show that the proposed scheduling mechanism will enhance the distribution grid flexibility to meet various charging requirements while maximizing the grid capacity.

1 June 2013
Verified
Conference Paper
Closed access
FLFang Liu
Fang Liu
WJWang Jinkuan
Wang Jinkuan
YHYinghua Han
Yinghua Han
PHPeng Han
Peng Han
A critical component of smart grid is the integration of multiple communication technologies which can facilitate the development of smart grid. However, most of the traditional communication technologies can not satisfy the critical and complex requirements of smart grid, such as, efficiency, reliability, resilience, sustainability, and security. In this paper, the cognitive radio (CR) technology is leveraged to construct the communication infrastructure of smart grid. First, ISM bands and leased bands are introduced as backup bands to ensure the QoS of data communications in CR based networks, for which a rule that decides when to stop spectrum sensing and access the ISM bands is also provided. Furthermore, a proper communication scheme is proposed for distributed generation system based on the fact that different renewable energy source has different active period during a day. Some licensed bands whose idle time is in line with the active period of renewable energy sources are set aside exclusively for distributed generation system access. The two schemes improve both the efficiency of spectrum utilization and reliability of cognitive communications in smart grid.

26 October 2015 in Mathematical Problems in Engineering
Verified
Journal Article
Open access
PDF file
YLYan Li
Yan Li
JWJin-Kuan Wang
Jin-Kuan Wang
PHPeng Han
Peng Han
YHYinghua Han
Yinghua Han
With the rapid development of the electric vehicle industry and promotive policies worldwide, the electric bus (E-bus) has been adopted in many major cities around the world. One of the most important factors that restrain the widespread application of the E-bus is the high operating cost due to the deficient battery management. This paper proposes a geometric-process-based (GP-based) battery management optimizing policy which aims to minimize the average cost of the operation on the premise of meeting the required sufficient battery availability. Considering the deterioration of the battery after repeated charging and discharging, this paper constructs the model of the operation of the E-bus battery as a geometric process, and the premaintenance time has been considered with the failure repairment time to enhance the GP-based battery operation model considering the battery cannot be as good as new after the two processes. The computer simulation is carried out by adopting the proposed optimizing policy, and the result verifies the effectiveness of the policy, denoting its significant performance on the application of the E-bus battery management.