Marijana Sreckovic

Marijana Sreckovic

Auto-generated profile, based on publicly available information

Marijana Sreckovic

TU Wien

Research Focus & Metrics

Academic Career Length

17Years (2010-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 October 2020 in Industrial Marketing Management
Verified
Journal Article
Closed access
MYMuhammad Zafar Yaqub
Muhammad Zafar Yaqub
MSMarijana Srećković
Marijana Srećković
GCGerard Cliquet
Gerard Cliquet
GHGeorge Hendrikse
George Hendrikse
JWJosef Windsperger
Josef Windsperger

8 June 2017 in Small Business Economics
Verified
Journal Article
Open access
PDF file
MSMarijana Srećković
Marijana Srećković
Building on the organizational capabilities view, this study explores the impact of network and managerial capabilities on the performance of entrepreneurial firms in the architecture and real estate sector. We apply an extended organizational capabilities model by integrating Porter’s value chain model and Grant’s hierarchy of organizational capabilities. Starting from differences in entrepreneurial orientation between architecture and real estate development firms, we argue that under higher environmental uncertainty, network capabilities are more important for the performance of architecture firms whereas managerial capabilities are more important for the performance of real estate development firms. Employing data from Austria, Germany, and Switzerland, the research results support the hypotheses. This study integrates Porter’s value chain concept and the organizational capabilities model and delivers a contribution to the organizational capability theory. In addition, it contributes to the entrepreneurship literature by showing that network capabilities are more important for creating competitive advantage in entrepreneurial firms than in other firms.

13 June 2017 in Small Business Economics
Verified
Journal Article
Closed access
PDF file
DHDildar Hussain
Dildar Hussain
MSMarijana Sreckovic
Marijana Sreckovic
JWJosef Windsperger
Josef Windsperger

19 February 2013 in Engineering Project Organization Journal
Verified
Journal Article
Closed access
IKIva Kovacic
Iva Kovacic
MSMarijana Sreckovic
Marijana Sreckovic
Buildings play a crucial role in the achievement of sustainability aims, due to the large energy consumption for operation and the related CO2 production rate. Generally prescriptive-normative strategies are being used for the increase of building performance in terms of energy efficiency. The focus is mainly upon the development and implementation of new technologies for energy-efficient building services and hull together with the improvement of calculation methods. Little effort has been invested into the rethinking of the design and planning process for sustainable buildings which are still planned in a traditional manner, where planning tasks are broken down into sequenced, highly specialized disciplines. The practitioners are aware of the need for a paradigm change in the planning culture and are asking for methods towards a more integrated, collaborative planning practice. We argue that for the achievement of sustainability aims more than energy-efficient technologies coupled with a prescriptive strategy are necessary, and we advocate a shift towards people (the planning-process-stakeholders) as carriers of sustainability. This paper focuses on the development of a holistic, life-cycle oriented planning strategy, which enables knowledge transfer from phase to phase, as well as the creation of common new knowledge. Critical herewith is the collaboration of all planning-process stakeholders (planners, users, managers) from the early planning phases on, since those are crucial for the latter building performance. In order to identify and evaluate the advantages of the integrated planning practice, we have conducted a role-playing experiment simulating integrated and sequential planning processes for an energy-efficient structure. The experiment was part of a research project Co_Be (Cost Benefits of Integrated Planning) at the Vienna University of Technology. The experiment identified efficiency, team- and process-satisfaction, as well as more balanced stress and conflict levels of the integrated planning teams as significant advantages of this treatment. The results of the experiment were verified within the stakeholder feedback-workshop with practitioners. There the need for the development of mechanisms supporting the design of interdisciplinary communication and knowledge creation as well as knowledge management within the integrated planning processes, was identified.

17 October 2023 in Sustainability
Verified
Journal Article
Open access
PDF file
FTFlorian Teichmann
Florian Teichmann
Azra KorjenicAzra Korjenic
Azra Korjenic
MSMarijana Sreckovic
Marijana Sreckovic
HVHannes Veit
Hannes Veit
DHDominik Hartmann
Dominik Hartmann
Despite the positive effects of green infrastructure on people and the environment, it is still rarely integrated in public facilities such as schools. The main reason for this is a lack of knowledge about financing options. To fill this gap, the research project MehrGrüneSchulen (Engl.: More Green Schools) develops financing scenarios for green infrastructure in Austrian schools. This case study describes these developed scenarios, which use the principles of crowdsourcing and crowdfunding as well as the newly named principle of chain building. The idea of chain building is to motivate schools that have already successfully financed and built a low-cost greening system to present this process to another school in such a way that they are able to do the same themselves and eventually explain the process to a further school to continue this chain reaction. For the proposed funding scenarios to be effective, there is a need for innovation in education, with a focus on inter-school participation and networking. For this reason, the possible synergies of an online networking platform are discussed, which would help to connect schools and thus further improve the impact of the proposed fundraising processes.

13 April 2020 in SSRN Electronic Journal
Verified
Preprint
Open access
PDF file
MSMarijana Sreckovic
Marijana Sreckovic
GSGoran Sibenik
Goran Sibenik
DBDominik Breitfuß
Dominik Breitfuß
TPThomas Preindl
Thomas Preindl
The increasing digitalization and thus evidently advancing change and necessary flexibility in the AEC indus-try, requires new business models, processes and strategies. blockchain (BC) and decentralized applications (DApps) or smart contracts are still underused for the architecture, engineering and construction (AEC) indus-try. The literature review of BC and its potential of inclusion into model-based communication, has shown that it is not just a technology that is ready to use, but requires a thorough insight into the design process of domain-specific stakeholders, their interests and their collaboration workflows for a holistic BIM-BC-supported solution for the design phase. This paper introduces process modeling of domain-specific processes and BIM-workflows in the design phase. We propose a conceptual framework for the implementation of a de-sign process with BC based on the integration of three underlying theories: design theory, configuration theo-ry and task-technology fit. The main premise is, before we can capture a process we need to understand it (de-sign), further in order to re-engineer it for DLT we need to adapt it to changing requirements (configure) and then continually re-adjust IT and business processes interdependence (task-technology fit).