Guikun Yu

Guikun Yu

Auto-generated profile, based on publicly available information

Guikun Yu

School of Management Engineering, Qingdao University of Technology, Qingdao, Shandong, China

Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
7 December 2023 in Kybernetes
Verified
Journal Article
Closed access
HZHui Zhao
Hui Zhao
XCXian Cheng
Xian Cheng
JGJing Gao
Jing Gao
GYGuikun Yu
Guikun Yu
Purpose: Building a smart city is a necessary path to achieve sustainable urban development. Smart city public–private partnership (PPP) project is a necessary measure to build a smart city. Since there are many participants in smart city PPP projects, there are problems such as uneven distribution of risks; therefore, in order to ensure the normal construction and operation of the project, the reasonable sharing of risks among the participants becomes an urgent problem to be solved. In order to make each participant clearly understand the risk sharing of smart city PPP projects, this paper aims to establish a scientific and practical risk sharing model.Design/methodology/approach: This paper uses the literature review method and the Delphi method to construct a risk index system for smart city PPP projects and then calculates the objective and subjective weights of each risk index through the Entropy Weight (EW) and G1 methods, respectively, and uses the combined assignment method to find the comprehensive weights. Considering the nature of the risk sharing problem, this paper constructs a risk sharing model for smart city PPP projects by initially sharing the risks of smart city PPP projects through Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) to determine the independently borne risks and the jointly borne risks and then determines the sharing ratio of the jointly borne risks based on utility theory.Findings: Finally, this paper verifies the applicability and feasibility of the risk-sharing model through empirical analysis, using the smart city of Suzhou Industrial Park as a research case. It is hoped that this study can provide a useful reference for the risk sharing of PPP projects in smart cities.Originality/value: In this paper, the authors calculate the portfolio assignment by EW-G1 and construct a risk-sharing model by TOPSIS-Utility Theory (UT), which is applied for the first time in the study of risk sharing in smart cities.

18 December 2023 in PLOS ONE
Verified
Journal Article
Open access
PDF file
HZHui Zhao
Hui Zhao
GYGuikun Yu
Guikun Yu
XCXian Cheng
Xian Cheng
Renewable hydrogen energy has received growing attention due to the energy shortage and increasing CO2 emissions. With these issues in mind, renewable hydrogen has become an important component of future energy systems in many countries, especially in the transportation sector. However, the shortage of hydrogenation station and the risks associated with their construction have become an urgent issue for the development of hydrogen energy transportation. To better implement the hydrogenation station project, a risk management framework is proposed for risk control. First, a comprehensive risk index system is developed, using a weighting method based on the G1 method and the C-OWA operator. Second, a grey fuzzy synthetic assessment method is applied to evaluate the risk based on the 3D risk assessment framework. Finally, risk is assigned to different participants and actionable measures are proposed. This paper summarizes the obstacles to the development of hydrogen energy transportation, highlights the potential of hydrogen energy development, and suggests workable solutions for the use of hydrogen energy in the future transportation industry.