Gabriel Nani

Gabriel Nani

Auto-generated profile, based on publicly available information

Gabriel Nani

Kwame Nkrumah University of Science and Technology

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
8 March 2024 in Building and Environment
Verified
Journal Article
Closed access
SASulemana Fatoama Abdulai
Sulemana Fatoama Abdulai
GNGabriel Nani
Gabriel Nani
RTRidwan Taiwo
Ridwan Taiwo
PAPrince Antwi-Afari
Prince Antwi-Afari
TZTarek Zayed
Tarek Zayed
ASAdebayo Olatunbosun Sojobi
Adebayo Olatunbosun Sojobi

15 August 2022 in Smart and Sustainable Built Environment
Verified
Journal Article
Closed access
SOSafowaa Osei-Tutu
Safowaa Osei-Tutu
JAJoshua Ayarkwa
Joshua Ayarkwa
DODickson Osei-Asibey
Dickson Osei-Asibey
GNGabriel Nani
Gabriel Nani
AAAba Essanowa Afful
Aba Essanowa Afful
Purpose: This study aimed to identify barriers impeding circular economy (CE) uptake in the construction industry in literature, categorize them for the development of a framework and to seek the interrelationships among the categorized barriers. This allowed for identifying integrated solutions to holistically address the barriers. The study also sought to identify the “hot” themes, the knowledge gaps and future research directions on barriers impeding CE.Design/methodology/approach: Forty-eight relevant articles were desk reviewed from different construction peer-reviewed journals and published conference papers. A scientometric analysis allowed for co-occurrence of keywords relating to CE. A content analysis enabled the identification of 79 barriers impeding the uptake of CE in the construction industry which were further categorized into six distinct categories for the development of a framework showing the interrelationships among the categorized barriers.Findings: The identified barriers include construction sector inertia, lack of design standards, lack of knowledge, awareness and understanding, design cost, and perception of second-hand materials as substandard among others. The study categorized the identified barriers for better understanding into six different groups: cultural barriers, social barriers, environmental barriers, economic barriers, technical barriers and technological barriers. Strategies to address the barriers were also proposed. The interrelationships among the various barriers were also shown in a proposed framework to educate professionals on the interconnectivity of the barriers.Practical implications: Categorization of the various barriers impeding CE uptake contributes to the body of knowledge. Also, the interrelationships among the various categorized barriers in the framework will enable construction professionals make informed decisions regarding the successful integration of CE in the industry, better appreciate the barriers that impede CE uptake and apply strategies to holistically address the barriers. This will expand current knowledge outside the narrow scope of isolated barriers.Social implications: To the global construction industry, the review presents a list of barriers and their interrelationships that could provide implementation strategies for the uptake of CE in the industry.Originality/value: The geographical scope of this study is not limited, and therefore encourages wide applicability of the findings to the global construction industry.

29 April 2021 in Smart and Sustainable Built Environment
Verified
Journal Article
Closed access
SMSarfo Mensah
Sarfo Mensah
GNGabriel Nani
Gabriel Nani
JAJoshua Ayarkwa
Joshua Ayarkwa
Purpose: There is low adoption rate of existing environmentally sustainable construction frameworks. Contractors have dwindled capability to adapt to environmentally sustainable construction (ESC) towards achievement of SDGs. The aim of this paper is to develop a framework that leverages both theoretical and practical aspects of sustainable construction to enable contractors' adaptation to ESC at the micro level.Design/methodology/approach: Due to the social constructivism orientation of the objectives of this research, abductive approach and qualitative research strategy were adopted. Data were obtained through interviews and validation focus group discussion. Content analysis and thematic template analyses techniques were employed to conduct qualitative data analyses.Findings: There are peculiar ESC barriers that need to be overcome by contractors in the study area. Legislative and financing efforts of stakeholders are key contractors' ESC adaptation drivers. Contractors in less affluent societies, such as Ghana, require high resilience, dense and centralized social network structures and isomorphic and coercive drivers to be able to adapt to ESC.Research limitations/implications: The scope of this research is limited to the data gathered from large construction firms in Ghana, a developing country in the sub-Saharan region.Originality/value: This is one of the first papers that provide guidelines on developing capability of contractors in a developing country to adapt to ESC. The paper addresses the challenge in the ecological modernization theory by adducing empirical evidence to prescribe guidelines on how contractors can increase rate of efficiency through collaborative strategies that engender ESC.

30 January 2019 in Journal of Architectural Environment & Structural Engineering Research
Verified
Journal Article
Open access
STSamuel Twum-Ampofo
Samuel Twum-Ampofo
GNGabriel Nani
Gabriel Nani
MTMershack Opoku Tetteh
Mershack Opoku Tetteh
Benjamin Kwaku AbabioBenjamin Kwaku Ababio
Benjamin Kwaku Ababio
Little study on performance measurement has been conducted within sub-Saharan Africa, where international construction joint ventures (ICJV) have become an emerging trend in construction. Consequently, the reliability and comparability of existing performance measures in such a new region are unknown. This paper adds to the existing knowledge by identifying the relevant joint venture (JV) performance measures within the Ghanaian construction industry. Using a self-administered data obtained through a questionnaire survey by purposive and snowball sampling, respondents rated their perceptions of 20 performance measures identified from the literature. Factor analysis established the variables measuring aspects of the same underlying dimensions. A total of four key performance measures were identified and explained in terms of a cooperative relationship, financial measures, strategic and learning measures. The findings would enlighten JV stakeholders of the reasons underlying the choice of performance metrics, while in a broader picture assist in choosing the right measures to evaluate the extent to which the objectives of the newly formed JV have been achieved.

17 April 2021
Verified
Book Chapter
Closed access
PDF file
CDCornelius Atsu Dafeamekpor
Cornelius Atsu Dafeamekpor
TAT. Adjei-Kumi
T. Adjei-Kumi
GNG. Nani
G. Nani
Ernest KissiErnest Kissi
Ernest Kissi

22 June 2026
Verified
Book Chapter
Closed access
GNGabriel Nani
Gabriel Nani
SBStephen Nti Buabeng
Stephen Nti Buabeng
BABismark Atakora
Bismark Atakora