Asha Dulanjalie Palihakkara

Asha Dulanjalie Palihakkara

Auto-generated profile, based on publicly available information

Asha Dulanjalie Palihakkara

University of Nottingham

Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
4 July 2023 in Smart and Sustainable Built Environment
Verified
Journal Article
Closed access
HVHasith Chathuranga Victar
Hasith Chathuranga Victar
BPB.A.K.S. Perera
B.A.K.S. Perera
APAsha Dulanjalie Palihakkara
Asha Dulanjalie Palihakkara
KDKaveesha Gihani Dewagod
Kaveesha Gihani Dewagod
Purpose: The construction industry is shifting towards becoming more circular by reducing waste, reusing building materials and embracing regenerative solutions for energy generation and biodiversity conservation. Thus, construction professionals must perform diversified services to achieve a circular built environment (CBE). Implementing resource planning and waste management in CBE has already posed challenges to the quantity surveying profession; thus, quantity surveyors (QSs) should be equipped with new roles and competencies to tackle challenges in achieving a CBE. Hence, this study aimed to investigate the functions and competencies of QSs at the design and building material sourcing stages in achieving a CBE according to 3R principles.Design/methodology/approach: The research apprehended a qualitative approach, including two expert interview rounds adhering to the Delphi technique with 14 and 11 experts per each round. Manual content analysis was incorporated to analyse the collected data.Findings: The research findings revealed the important roles and competencies of QSs in achieving a CBE. In addition, essential functions and competencies were categorised according to the 3R principles (reduce, reuse, recycle) to successfully implement CBE during the Design and Building Material Sourcing stages. According to the 3R principles of CBE, cost control, cost planning, feasibility studies, measurement and quantification, risk management, value engineering and innovations and technologies were well-received by most interviewees as essential roles of QSs during the Design and Building Material Sourcing stages. Further, basic/mandatory competencies (personal, interpersonal, professional practice and business skills), economic analysis, BIM management, cost management and risk management are highly regarded by experts for QS as important competencies to achieve CBE.Originality/value: With new construction trends, QSs must enhance their conventional roles and competencies and search for new skills and competencies. Those skills and competencies could be linked to the CE concept, either directly or indirectly. Since QS holds a prominent place in sustainable construction in CBE, adapting to changes in the construction industry such as CBE is timely for QSs. Further, there is a shortage of literature regarding QSs' roles and competencies in achieving a CBE; thus, this study will contribute by identifying new avenues for QSs in achieving a CBE in the practice and the research.

1 January 2025 in Journal of Information Technology in Construction
Verified
Journal Article
Open access
PDF file
APAsha D. Palihakkara
Asha D. Palihakkara
Carlos Arturo Osorio-SandovalCarlos Arturo Osorio-Sandoval
Carlos Arturo Osorio-Sandoval
WTWalid Tizani
Walid Tizani
As the construction industry is moving towards digitalisation, the integration of advanced technologies like Building Information Modelling (BIM) and digital twins has become essential for enhancing project efficiency. Currently, the industry has the capacity to operate at BIM Maturity stage 2 but faces challenges in achieving seamless data integration and interoperability. Progressing toward BIM Maturity Stage 3 could benefit from adopting semantic web and linked data technologies, which enable a more structured, machine-readable data environment. However, the path to this level of integration remains complex. At the heart of the semantic web lies ontologies, playing a pivotal role in structuring domain knowledge. Therefore, through a systematic literature review, this study explores the integration of ontologies and semantic web technologies in BIM or Digital Twin environments for construction management. This study provides a trend and theoretical analysis under different construction management use cases to identify how ontologies and semantic web technologies have been utilised during the construction execution phase. The study identified eight different use cases, including safety management, compliance checking, and construction planning and production control, among others. The findings emphasise that while there is great potential in using ontologies and the semantic web for data integration, significant barriers remain, such as data privacy concerns, scalability issues, and the complexity of ontology mapping. These findings underscore the importance of addressing these challenges to fully harness the capabilities of semantic web technologies within BIM environments, providing a potential roadmap toward realising BIM Maturity Stage 3 and to enhance collaboration and data exchange in the construction industry. This study provides a roadmap for future research and technological development in applying semantic web technologies to advance construction management.

31 January 2022 in Smart and Sustainable Built Environment
Verified
Journal Article
Closed access
APAsha Dulanjalie Palihakkara
Asha Dulanjalie Palihakkara
BPB.A.K.S. Perera
B.A.K.S. Perera
Purpose: Guaranteed maximum price (GMP) contracts are becoming an increasingly popular contract solution; however, many projects experience higher levels of risk and exceed predetermined GMPs, failing to accomplish the main motive behind the concept. Thus, the study identified a risk management process for GMP projects.Design/methodology/approach: The study adopted a quantitative approach consisting of three Delphi rounds. The collected data were analysed using statistical data analysis tools.Findings: The study identified 17 highly significant risk factors in GMP projects and determined their levels of severity. Subsequently, risk allocation amongst the client, contractor and consultant and strategies to handle the most significant risk factors were determined. The study identified poorly defined scope and design changes as the most critical risks in GMP projects. Moreover, strategies such as clearly defining the project scope, preparing precise documentation, early involvement of the contractor and using a partnering approach can be deployed to reduce the risk in GMP projects. Each risk has to be assigned to the party who can best manage it, depending on its nature.Originality/value: The study addresses the literature gap pertaining to risk management of GMP contracts by identifying its overall process, including the identification of significant risks based on the severity levels; risk allocation amongst the client, contractor and consultant; and identification of risk handling techniques suitable for each significant risk factor. The study contributes to the industry by identifying a systematic risk management process to implement GMP projects successfully within the stipulated time, cost and quality.

9 November 2023 in ITU Press, Press of the Istanbul Technical University
Verified
Journal Article
Closed access
BPB.A.K.S. Perera
B.A.K.S. Perera
ASAravindi Samarakkody
Aravindi Samarakkody
APA.D. Palihakkara
A.D. Palihakkara
DDD.M.C.K. Dissanayake
D.M.C.K. Dissanayake
MAMahendrini Ariyachandra
Mahendrini Ariyachandra

14 March 2025
Verified
Book Chapter
Closed access
PDF file
APAsha Dulanjalie Palihakkara
Asha Dulanjalie Palihakkara
COCarlos Osorio-Sandoval
Carlos Osorio-Sandoval
WTWalid Tizani
Walid Tizani