Yan-Chao Gao

Yan-Chao Gao

Auto-generated profile, based on publicly available information

Yan-Chao Gao

Institute of Mountain Hazards and Environment, CAS

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
13 June 2019 in Journal of Mountain Science
Verified
Journal Article
Closed access
PDF file
YGYan-Chao Gao
Yan-Chao Gao
NCNing-shen CHEN
Ning-shen CHEN
GHGui-Sheng Hu
Gui-Sheng Hu
MDMingfeng Deng
Mingfeng Deng

11 October 2018 in Journal of Mountain Science
Verified
Journal Article
Closed access
PDF file
NCNing-Sheng Chen
Ning-Sheng Chen
YGYan-Chao Gao
Yan-Chao Gao
CYCheng-Lin Yang
Cheng-Lin Yang
GHGui-Sheng Hu
Gui-Sheng Hu

23 March 2020
Verified
Conference Paper
Open access
YGYanchao Gao
Yanchao Gao
SZSongjiang Zhao
Songjiang Zhao
JWJiazhu Wang
Jiazhu Wang
WXWei Xu
Wei Xu
Strong earthquakes often induce a substantial rise in secondary geohazards. This problem has been studied more after the Great Kanto Earthquake in Japan and the Chichi Earthquake in Taiwan. In western China, after the 2008 Mw7.9 Wenchuan earthquake, large-scale regional debris flows occurred in 2008, 2009, 2010, 2011, 2013, 2014, and 2019 in the strong earthquake zone. Many control projects have been constructed, including more than 1,000 check dams. Part of the projects were damaged in the subsequent large debris flows. Debris flow after the earthquake is characterized by many loose sources, high frequency and large magnitude. Traditional design parameters and control engineering cannot meet disaster prevention requirements. In the 11 years after the Wenchuan earthquake, our research team continued to investigate the formation of the debris flow in the earthquake area, and summarized the reasons for the failure of the control projects, such as the low estimate of the loose sources and the insufficient design capacity of the check dam. In response to the above problems, we have proposed corresponding solutions, including the optimal combination of different control measures, the design of the dam site and storage capacity, and the structural form of the check dam. This optimization concept has been applied in debris flow prevention such as Qipan gully and Shaofang gully and has achieved good control results. The research provides a reference for subsequent disaster prevention and mitigation in similar earthquake areas.