28 June 2024 in Building constructions. Theory and Practice
For many years, an urgent problemin Ukraine is a technical renovation of the existing housing stock of mass-series buildings. Most of them were built with precast concrete elements inthe 1960s–1970s. The design lifecycle of such buildings was determined for 25 years. Therefore they have obsolescence and backwardness. That expressed in inconformity with modern design codes for residential buildings, the absence of elevators, the unavailability of engineering communications, low heat and energy efficiency and environmental compatibility of such buildings. On the other hand, the technical examinations of concrete structures of such houses showed that at least 80 % of them havenot depleted their bearing capacity resource. The problem of buildings renovation was especially emphasized by the destructive consequences of theRussian federation armed aggression in Ukraine. The paper describes the experience of renovation with reconstruction of the old 5-storey residential building into modern 9-storey multi-apartment residential building. Construction works included redevelopment of the interior space, elevator installation, and replacement of the utilities by the modern ones and using of up-to-date technologies to improve the energy efficiency of the building. The project provides increasing the number of stories.
28 June 2025 in Building constructions. Theory and Practice
Ukrainian cities and villages have been forced to become testing grounds for studying and researching the impact of blasts on buildings and structures of different structural systems due to the constant artillery shelling and bombardments by the russian federation’s armed forces. Ukraine’s seaports are strategic facilities, so port infrastructure is often damaged by russian drone and missile attacks. The Odesa’s city port is the largest seaport in Ukraine, so for studying and researching, as a typical example, one of the damaged buildings of this port was chosen. The object of research – load-bearing structures damaged due to blast exposure of missile strike by the armed forces of the russian federation. The purpose of the research is to determine the actual technical state of the building’s load-bearing structures; to check the ability to repairment of the building. The research included such stages as: visual inspection of the survived structures after the missile strike; determination of the real concrete strength by non-destructive methods; verification finite element method (FEM) analysis of the building’s structural system, taking into account the actual technical state and real material properties; design of strengthening schemes for the survived structures. The number of civil buildings and infrastructure facilities damaged or collapsed by russian attacks is increasing day by day. Case study presented in this research is typical and can be recognized as a solution for other buildings.
16 November 2026 in Theory and Building Practice
This study presents numerical modelling and structural assessment of a modular prefabricated reinforced concrete shelter. The initial configuration with 160 mm walls was compared with a modernized design using 330 mm C25/30 concrete walls. Regulations in Ukraine and five European countries were reviewed to contextualize thickness requirements. Structural checks under equivalent quasi-static blast-wave loading were performed in accordance with Ukrainian standards and Eurocode 2 using IDEA StatiCa. The 160 mm design showed insufficient bearing capacity, whereas the 330 mm configuration satisfied the adopted strength criteria. Although increased thickness reduced the calculated reinforcement demand, minimum code-prescribed detailing must be maintained. Further verification is needed for precast joints, local penetration, concrete spalling and dynamic blast response.