6 September 2021 in IEEE Transactions on Network and Service Management
As a networked cyber physical system, smart grid plays an important role in improving energy efficiency, which has higher prediction accuracy requirement for load forecasting to realize intelligent dispatching. The existing works of load forecasting have considered the external factors to improve prediction accuracy, but ignored their varying and different impacts in different time. In order to solve this problem, firstly, a new method is designed to select external meteorological factors and construct new features to deal with the different impacts of external factors in different seasons. Secondly, a fuzzy processing method of calendar factor is proposed to explore the varying impact of the calendar factor in the holiday period. Finally, our proposed method is combined with LSTM and other three typical machine learning models, and experiments are performed on a load data set from the real power system. The results show that our proposed method can improve the prediction accuracy of the typical machine learning based models. Especially for LSTM, the MAPEs reach to 3.8% and 3.1% in winter and summer, with the improvements of 0.6% and 0.3% respectively.
16 April 2021 in Recent Advances in Electrical & Electronic Engineering (Formerly Recent Patents on Electrical & Electronic Engineering)
Background : The day-ahead load forecasting is an essential guideline for power generating, and it is of considerable significance in power dispatch. Objective: Most of the existing load probability prediction methods use historical data to predict a single area, and rarely use the correlation of load time and space to improve the accuracy of load prediction. Methods: This paper presents a method for day-ahead load probability prediction based on spacetime correction. Firstly, the kernel density estimation (KDE) is employed to model the prediction error of the long short-term memory (LSTM) model, and the residual distribution is obtained. The correlation value is then used to modify the time and space dimensions of the test set's partial period prediction values. Results: The experiment selected three years of load data in 10 areas of a city in northern China. The MAPE of the two modified models on their respective test sets can be reduced by an average of 10.2% and 6.1% compared to previous results. The interval coverage of the probability prediction can be increased by an average of 4.2% and 1.8% than before. Conclusion: The test results show that the proposed correction schemes are feasible.