Total conceptual cost estimates and the assessment of the quality of these estimates are critical in the early stages of a building construction project. In this study, the support vector machine (SVM) model for assessing the quality of conceptual cost estimates is proposed, and the application of SVM in construction areas is investigated. The results show that the SVM model assessed the quality of conceptual cost estimates slightly more accurately than the discriminant analysis model. This shows that using the SVM has potential in construction areas. In addition, the SVM model can assist clients in their evaluation of the quality of the estimated cost and the probability of exceeding the target cost, and in their decision on whether or not it is necessary to seek a more accurate estimate in the early stages of a project.
20 August 2013 in Journal of the Korea Institute of Building Construction
The steel fabrication and installation works in a steel-structured building project account for 20% of the entire construction cost. In estimating construction costs, a few parameters are more significant than work item productivity. However, the Standardized Productivity (SP) of steel works presented in Poom-Sam, which is the standardized estimating guide system used in the public sector in Korea, has rarely been updated since its establishment in the 1970s. In order to update and improve its structure and figures, 15 construction sites and 5 steel fabrication shops were visited over a period of two years. From the study, it was found that the structure of Poom-Sam was rather complex and outdated and that the average SP of the works analyzed from the research was approximately 85% of the current SP. Moreover, the effect of the productivity differences on total construction cost was approximately 10%. The productivity improvements and amended Work Breakdown Structure (WBS) are attributable to the technology advancements in equipment and construction methods over the past two decades. The results of this study will improve the reliability and accuracy of cost estimation in steel works.
25 August 2008 in Journal of the Korea Institute of Building Construction