Riswal Karamma

Dr. Riswal Karamma

Department of Civil Engineering, Hasanuddin University, Makassar, Sulawesi Selatan, Indonesia
orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 October 2025 in Civil Engineering Journal
Verified
Journal Article
Open access
PDF file
ALAlexander Leda
Alexander Leda
RLRita Tahir Lopa
Rita Tahir Lopa
FMFarouk Maricar
Farouk Maricar
Riswal KarammaRiswal Karamma
Riswal Karamma
Changes in rainfall patterns driven by climate change have altered the hydrological regime of river basins, creating substantial challenges for water resources management, particularly in the operation of the Batutegi cascade system comprising the Batutegi Dam, Way Sekampung Dam, Argoguroh Weir, Margatiga Dam and Jabung Weir. This study assesses the impacts of climate change on rainfall intensity, dependable flow, and water allocation modeling within the Sekampung River Basin. The analysis employed five rainfall datasets downscaled from the NASA Earth Exchange Downscaled Climate Projections at 30 arc-seconds (NEX-DCP30) and simulated using five CMIP6 models for both the historical period (1980–2014) and future projections (2024–2100). Results indicate that CMIP6 projections reproduce rainfall patterns reasonably well during January–February and May–July, but perform less consistently in March–April and October–November. Most models tend to overestimate the mean annual rainfall. Rainfall variability contributes to pronounced fluctuations in river discharge, particularly during the dry season. Dependable flows show marked changes, especially within the exceedance probability range of Q10% to Q100%. Although an overall increasing rainfall trend is observed, the system is still able to satisfy water demand under the 2023 operating rules, with potential deficits persisting during critical periods. Optimization modeling further demonstrates the necessity of adaptive reservoir operation rules under climate change, which could improve the reliability of meeting multisectoral demands to approximately 80%. These findings underscore the importance of incorporating climate model projections into watershed-based water resources management to strengthen resilience against extreme hydroclimatic variability.

1 December 2022 in Civil Engineering and Architecture
Verified
Journal Article
Open access
PDF file
Riswal KarammaRiswal Karamma
Riswal Karamma
SBSugiarto Badaruddin
Sugiarto Badaruddin
RMRifaldi Mustamin
Rifaldi Mustamin
ZSZubair Saing
Zubair Saing
A dam is one of the water structures that have many benefits for humans. However, flood disasters caused by dam break may have a very bad impact on human life. This study specifically analyzed the impact of flooding caused by the failure of the Karalloe dam in Bone Regency, South Sulawesi Province, Indonesia. For the first time, the selected flood discharge used in the dam break analysis was verified using the Creager graph by comparing the calculated discharge from several synthetic unit hydrograph methods (HSS) with the flood discharge measured on the automatic water level recorder (AWLR) at the monitoring point. The impact of flooding due to dam break was simulated using HEC-RAS 2D combined with ArcGIS for mapping. The calculation results of the design flood discharge based on rainfall data using the methods of HSS Nakayasu, HSS ITB I, HSS ITB II, and HSS SCS (HEC-HMS) as well as the calculation of the designed flood discharge based on the discharge data showed that the design flood discharge value which is closest to the measured discharge value and Q1000 Creager was the HSS SCS method. The flood discharge values obtained based on the HSS SCS method for Tr (return period) 2 years, Tr 5 years, Tr 10 years, Tr 20 years, Tr 25 years, Tr 50 years, Tr 100 years, and Tr 1000 years were 322.70 m 3 /s, 464.10 m3/s, 560.40 m 3 /s, 658.40 m 3 /s, 682.70 m 3 /s, 787.00 m 3 /s, 885.70 m 3 /s, and 1202.60 m 3 /s, respectively. The simulation results showed that 22 villages will be affected by flooding due to the failure of the Karalloe dam and the fastest standby time of the flood is 12 minutes, namely at Lookout Point 7 in Paitana Village. This result suggests that early warning system should be installed at the downstream of the dam and flood disaster mitigation should be adopted and applied to these threatened area.

8 July 2024 in Earth
Verified
Journal Article
Open access
PDF file
MMMuhammad Rifaldi Mustamin
Muhammad Rifaldi Mustamin
FMFarouk Maricar
Farouk Maricar
RLRita Tahir Lopa
Rita Tahir Lopa
Riswal KarammaRiswal Karamma
Riswal Karamma
A flood forecasting and early warning system is critical for rivers that have a large flood potential, one of which is the Gilireng watershed, which floods every year and causes many losses in Wajo Regency, Indonesia. This research also introduces an integration model between UH SUH and HEC-RAS in flood impact analysis, as a reference for flood forecasting and early warning systems in anticipating the timing and occurrence of floods, as well as GIS in the spatial modeling of flood-prone areas. Broadly speaking, this research is divided into four stages, namely, a flood hydrological analysis using UH SUH, flood hydraulic tracing using a 2D HEC-RAS numerical model, the spatial modeling of flood-prone areas using GIS, and the preparation of flood forecasting and early warning systems. The results of the analysis of the flood forecasting and early warning systems obtained the flood travel time and critical time at the observation point, the total time required from the upstream observation point to level 3 at Gilireng Dam for 1 h 35 min, Mamminasae Bridge for 4 h 35 min, and Akkotengeng Bridge for 8 h 40 min. This is enough time for people living in flood-prone areas to evacuate to the 15 recommended evacuation centers.

1 March 2020 in IOP Conference Series: Materials Science and Engineering
Verified
Conference Paper
Open access
PDF file
Riswal KarammaRiswal Karamma
Riswal Karamma
MPM.SAleh Pallu
M.SAleh Pallu
MTM. Arsyad Thaha
M. Arsyad Thaha
MHMukhsan Putra Hatta
Mukhsan Putra Hatta
AMA. Subhan Mustari
A. Subhan Mustari
ASAhmad Syarif Sukri
Ahmad Syarif Sukri
The length of the Makassar Coast reaches ± 35.52 km. In the northern coastal area of Makassar City, the Tallo River Estuary and the south side of the Jeneberang River Estuary, both estuaries can affect longshore sediment transport on the coast of Makassar City. The purpose of this research was to determine the direction of longshore sediment transport on the coast at the estuaries of the Jeneberang River and Tallo River caused by waves on the Makassar Coast. The analysis carried out in this research is the analysis of wind direction, wind speed, effective retrieval, wave forecasting, wave return analysis, breaking wave analysis and longshore sediment transport analysis. The result of this research indicates that the longshore sediments transport in the Tallo River Estuary is relatively heading north or away from the coast of Makassar and longshore sediments transport in the Jeneberang River Estuary is relatively heading north or heading to the coast of Makassar.

3 April 2025 in Engineering, Technology & Applied Science Research
Verified
Journal Article
Open access
PDF file
Riswal KarammaRiswal Karamma
Riswal Karamma
SBSugiarto Badaruddin
Sugiarto Badaruddin
MMMuhammad Rifaldi Mustamin
Muhammad Rifaldi Mustamin
Muhammad Ihsan MukrimMuhammad Ihsan Mukrim
Muhammad Ihsan Mukrim
This study aims to address the persistent flooding in Sinjai District, Indonesia, by developing a comprehensive spatial flood risk model. The development of this model was conducted using hazard, vulnerability, and capacity index data. The research first determines the weighted scores of the hazard, vulnerability, and capacity indices to categorize areas into high, medium, and low flood risk zones as a reference in developing flood mitigation. The study further uses the Unmanned Aerial Vehicle (UAV) technology to facilitate the collection of topographic data, which are then used as an input in the hydrological and hydraulic analysis. The overarching objective of this research is to provide insights and recommendations to policymakers, with the aim of informing effective strategies for reducing the flood risk. The results indicate that low-risk areas encompass 564.45 hectares, medium-risk areas extend to 645.83 hectares, and high-risk areas cover 46.19 hectares. The proposed flood control measures include the construction of retention ponds, embankments, and river normalization. These interventions have the potential to reduce up to 507.12 hectares, equivalent to 40.36% of the inundation area, thereby reducing the impact of flooding. The findings provide important guidance for policymakers in making decisions, devising mitigation strategies, and promoting sustainable development in the region.

1 January 2020 in IOP Conference Series: Earth and Environmental Science
Verified
Conference Paper
Open access
PDF file
Riswal KarammaRiswal Karamma
Riswal Karamma
MPM S Pallu
M S Pallu
MTM A Thaha
M A Thaha
MHM P Hatta
M P Hatta
This research is a field study conducted in the estuary Jeneberang river. The estuary, the transitional zone formed between the river environment and the marine environment. In this region, there is the mixing of seawater with fresh water that has its own uniqueness with fluctuating salinity. This research aims to see the pattern of salinity distribution and temperature in the area of Jeneberang estuary on the tide and receding conditions. Data retrieval channeled on the area of Jeneberang estuaries with a distance between points 200 m using the ADCP (Acoustic Doppler Current Profiler) and CTD (Conductivity Temperature Depth) tools. The results showed an increase in salinity at Jeneberang estuary, which was influenced by surface and river bed.