Christina Freeman

Christina Freeman

Auto-generated profile, based on publicly available information

Christina Freeman

Florida Department of Transportation, M.H. Ansley Structures Research Center, Tallahassee, FL

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 July 2020 in Journal of Bridge Engineering
Verified
Journal Article
Closed access
PDF file
FCFrancisco Chitty
Francisco Chitty
CFC. J. Freeman
C. J. Freeman
DGDavid Garber
David Garber
The Florida Slab Beam (FSB) has been developed by the Florida Department of Transportation (FDOT) to be used for short-span bridges [less than about 19.8 m (65 ft) long]. The FSB system consists of shallow precast, prestressed concrete inverted-tee beams that are placed adjacent to each other and then involve reinforcement and concrete being placed in the inner joints and deck all in one single cast. Ultra-high-performance concrete (UHPC) is becoming more widely used in bridge construction applications as a result of its remarkable structural performance. Many departments of transportation have tested and deployed the use of UHPC in bridges around the United States. Most of these applications have been to connect precast members (e.g., slabs to beams and slabs, adjacent beams, caps to columns, etc.). A modified FSB design is desired to eliminate the cast-in-place (CIP) deck and allow for UHPC to be used in the joint region, which will allow for accelerated construction and decrease the impact of construction on traffic. Different joint details and cross-section geometries were analyzed and experimentally evaluated to determine feasible joint details with UHPC for slab beam bridges used in accelerated construction. Results from numerical modeling, strength, and fatigue experimental testing of the transverse joint performance of four different UHPC joints in two different depth slab beam bridges are presented. Straight-side and shear-key UHPC joint details were found to behave similar to or better than the current FSB joint detail.

26 October 2022 in Experimental Techniques
Verified
Journal Article
Closed access
PDF file
OAO. Adegbulugbe
O. Adegbulugbe
SJS. Jung
S. Jung
RKRaphael Kampmann
Raphael Kampmann
CFC. Freeman
C. Freeman
GWG. Wan
G. Wan
RHR. Herrera
R. Herrera

13 April 2024 in Transportation Research Record: Journal of the Transportation Research Board
Verified
Journal Article
Closed access
CFChristina Freeman
Christina Freeman
WPWilliam Potter
William Potter
SNSteven Nolan
Steven Nolan
Potential exists for construction time savings through replacement of cast-in-place substructure columns, piers, or both, with prefabricated bridge elements and systems. Cast-in-place substructure construction requires forming, placing steel, and pouring concrete at the construction site. Using prefabricated elements would decrease the extent of work required at the site and potentially reduce concrete curing time. This research furthers the effort to use ultra-high-performance concrete (UHPC) as a joining material for prefabricated bridge substructure elements. UHPC has a high early strength, requires less development or splice length than conventional concrete, and has been used previously for accelerated construction projects, such as bridge deck replacement with precast units. UHPC also has a discontinuous pore structure that reduces liquid ingress, significantly enhancing durability compared to conventional concrete. Although UHPC has been researched extensively, previous research for reinforcing bar splice and development lengths has focused on #9 and smaller diameter bars. Typically, larger diameter bars are used for substructures. This research determined the required splice lengths for large diameter steel deformed reinforcing bars embedded in UHPC based on 127 individual tests. Three primary variables were included in the testing matrix: bar size, bar spacing, and concrete cover. To achieve at least 75 kips per square inch (ksi) (517 MPa) reinforcing bar stress in UHPC with an early age strength of 14 ksi (97 MPa), the required embedment length ranges from 8 to 13 times the bar diameter and the corresponding splice length varies from 6 to 11 times the bar diameter, depending on the bar size and concrete cover.

1 June 2021 in Journal of Bridge Engineering
Verified
Journal Article
Closed access
PDF file
CFC. J. Freeman
C. J. Freeman
Sponsored by the Structural Engineering Institute

2 June 2019
Verified
Conference Paper
Closed access
PDF file
CFChristina Freeman
Christina Freeman
WPWilliam Potter
William Potter