Deep and high-stress mining relies on backfill to support exposed host rock surfaces, but the backfill response to isotopic compression is virtually unknown. This paper studied the properties and behavior of a cemented paste backfill (CPB) for different cement contents (CCs) and specimen curing times (CTs), for isotropic stresses up to 6.5 MPa. The isotropic compressive behavior was characterized by an initial linear elastic preyield response quantified by the bulk modulus and a linear inelastic postyield response at high stress. The results showed that the postyield compression line loci depend on cement content and curing time of CPB, and fitting functions were determined to predict this evolving behavior based on cement content and specimen cure time. The results could form the basis for developing and calibrating the isotropic compression hardening laws for future constitutive models.
15 June 2020 in Rock Mechanics and Rock Engineering
This article presents the results of a laboratory study on the variation of specific gravity (Gs) and void ratio (e) in a cemented paste backfill (CPB) with different cement contents and curing times. CPBs consist of a mixture of mine tailings, portland cement, and mine process water. In this study, a helium stereopycnometer device was used to determine Gs for specimens having cement contents of 3.0, 5.3, 7.5, and 11.1 % by the weight of dry tailings. Curing times of 4 h, 1, 3, 7, 14, and 28 days were considered for testing purposes. In total, 240 helium stereopycnometer tests were conducted in this study, which shows that Gs decreases in the CPB specimens as specimens cure over time and the cement hydrates. Furthermore, 96 tests were conducted to determine e of the CPB specimens with different combinations of cement contents and curing times. The results of these tests indicate that similar to Gs, e decreases with an increase in curing time as the specimens hydrate. The reduction in Gs and e is attributed to the formation of hydration products, which have a lower density than the cement and fill the void space between the particles. The results show that the variation of Gs that is due to the hydration process should be considered in the calculation of e; otherwise, this physical property, especially for specimens with high cement contents, is overestimated.
6 January 2022 in Geotechnical and Geological Engineering