After the ecological reconstruction of the "Pljevlja" thermal power plant, ash and slag are produced as combustion by-products in amounts of 420.000 t and 70.000 t, while after desulphurization process, gypsum is obtained in the amount of 154.000 t. This paper deals with the transportation of all three materials by conveyors from the storage silo to the new material loading location within the thermal power plant.
Investment projects in the mining sector are complex due to high capital requirements, technical uncertainty, operational constraints and strict environmental and safety requirements. This paper analyzes the key challenges that influence the planning and management of mining investment projects, with special attention to scope definition, multidisciplinary coordination, equipment procurement, production downtime, cost control and regulatory compliance. The paper emphasizes the need for an integrated project management approach that connects technical planning, resource coordination, risk management and continuous monitoring in order to improve project performance and support successful implementation in mining organizations.
1 January 2025 in Mining and Metallurgy Engineering Bor
The paper presents an approach to managing the development of the main mining project for an X-Ray sensor-based coal sorting plant under complex technical and organizational conditions at the Gacko open-pit mine. The project team was virtual in nature, consisting of members from multiple countries and disciplines. Through the application of modern project management tools (OBS, WBS, MS Project), the efficiency of planning, control, and risk management was analyzed. The results highlight the importance of a multidisciplinary and digitally integrated approach in the implementation of complex mining projects.
Modern mining systems require advanced architectural and construction solutions to ensure functionality, safety, and efficiency. Traditional two-dimensional design methods are increasingly insufficient for managing complex facilities. Building Information Modeling (BIM) offers a modern, integrated approach to digital project modeling. This paper examines the use of BIM tools in mining facility design, focusing on architectural and structural aspects. It highlights key benefits such as improved technical coordination, visualization, and documentation quality, while addressing implementation challenges. Through practical examples, the study demonstrates the potential of BIM to enhance the efficiency and quality of mining design processes.
1 January 2024 in Mining and Metallurgy Engineering Bor
This paper aims to review the design of a pedestrian bridge on the displaced riverbed of the Ćehotina River in city Pljevlja. The footbridge is intended for pedestrian and cyclist traffic. The design of the pedestrian bridge is part of the Main Design of Bridges on the Displaced Riverbed of the Ćehotina River. The paper describes in detail the bridge design, the choice of a static calculation software, as well as which standards were used for dimensioning the elements and adopting legally prescribed bridge dimensions.
This paper will cover the Preliminary Design of the by-products transport system after the Ecological reconstruction of the thermal power plant Pljevlja. The 4.5 km belt conveyor long route enters the tunnel at Borovica Lake. Tunnel position is in relation to the route, the cross-section selection, calculation of structural elements and fitting into the ambient unit around the lake are described.