Chang Wook Kang

Chang Wook Kang

Auto-generated profile, based on publicly available information

Chang Wook Kang

Department of Industrial and Management Engineering, Hanyang University ERICA, Ansan-si, South Korea

Research Focus & Metrics

Academic Career Length

24Years (2003-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 April 2007 in Journal of Quality Technology
Verified
Journal Article
Closed access
CKChang W. Kang
Chang W. Kang
MLMan S. Lee
Man S. Lee
YSYoung J. Seong
Young J. Seong
DHDouglas M. Hawkins
Douglas M. Hawkins
Monitoring variability is a vital part of modern statistical process control. The conventional Shewhart R and S charts address the setting where the in-control process readings have a constant variance. In some settings, however, it is the coefficient of variation, rather than the variance, that should be constant. For example, this setting is common in clinical chemistry, and then conventional R and S charts cannot be used. This paper develops a chart, equivalent to the S chart, for monitoring the coefficient of variation using rational groups of observations.

29 November 2018 in Project Management Journal
Verified
Journal Article
Closed access
HKHyukchun Kwon
Hyukchun Kwon
CKChang Wook Kang
Chang Wook Kang
Project risk is a critical factor in estimating project budget. Previous studies on this topic have only addressed estimation methods that consider project budget reserves against identified risks. As a result, project managers still face the challenge of completing projects within given budgets but without the relevant tools to deal with unidentified risks. This study proposes an approach for estimating reserves for both identified and unidentified risks separately. The study also suggests using the three-point estimation technique and R-value determination for estimating risk costs, which can improve budget accuracy and precision. The construction of residential building projects in South Korea demonstrates the advantages of the proposed approach compared with previous methods.

4 June 2003 in Applied Mathematical Modelling
Verified
Journal Article
Closed access
PDF file
Sun HurSun Hur
Sun Hur
JKJong-Soo Kim
Jong-Soo Kim
CKChangwook Kang
Changwook Kang

1 June 2019 in Mathematics
Verified
Journal Article
Open access
PDF file
CKChang Wook Kang
Chang Wook Kang
MMuhammad Imran
Muhammad Imran
Muhammad OmairMuhammad Omair
Muhammad Omair
WAWaqas Ahmed
Waqas Ahmed
MUMisbah Ullah
Misbah Ullah
Biswajit SarkarBiswajit Sarkar
Biswajit Sarkar
Sustainable healthcare systems are gaining more importance in the era of globalization. The efficient planning with sustainable resources in healthcare systems is necessary for the patient’s satisfaction. The proposed research considers performance improvement along with future sustainability. The main objective of this study is to minimize the queue of patients and required resources in a healthcare unit with the consideration of staff absenteeism. It is a resource-planning model with staff absenteeism and operational utilization. Petri nets have been integrated with a mixed integer nonlinear programming model (MINLP) to form a new approach that is used as a solution method to the problem. The Petri net is the combination of graphical, mathematical technique, and simulation for visualizing and optimization of a system having both continuous and discrete characteristics. In this research study, two cases of resource planning have been presented. The first case considers the planning without absenteeism and the second incorporates planning with the absenteeism factor. The comparison of both cases showed that planning with the absenteeism factor improved the performance of healthcare systems in terms of the reduced queue of patients and improved operational sustainability.

19 May 2019 in Mathematics
Verified
Journal Article
Open access
PDF file
CKChang Wook Kang
Chang Wook Kang
MUMisbah Ullah
Misbah Ullah
MSMitali Sarkar
Mitali Sarkar
Muhammad OmairMuhammad Omair
Muhammad Omair
Biswajit SarkarBiswajit Sarkar
Biswajit Sarkar
Each industry prefers to sell perfect products in order to maintain its brand image. However, due to a long-run single-stage production system, the industry generally obtains obstacles. To solve this issue, a single-stage manufacturing model is formulated to make a perfect production system without defective items. For this, the industry decides to stop selling any products until whole products are ready to fulfill the order quantity. Furthermore, manufacturing managers prefer product qualification from the inspection station especially when processes are imperfect. The purpose of the proposed manufacturing model considers that the customer demands are not fulfilled during the production phase due to imperfection in the process, however customers are satisfied either at the end of the inspection process or after reworking the imperfect products. Rework operation, inspection process, and planned backordering are incorporated in the proposed model. An analytical approach is utilized to optimize the lot size and planned backorder quantities based on the minimum average cost. Numerical examples are used to illustrate and compare the proposed model with previously developed models. The proposed model is considered more beneficial in comparison with the existing models as it incorporates imperfection, rework, inspection rate, and planned backorders.

1 January 2003 in International Journal of Production Research
Verified
Journal Article
Closed access
KJKhi-Young Jang
Khi-Young Jang
KYKai Yang
Kai Yang
CKChangwook Kang
Changwook Kang
A developed methodology of using an artificial neural network to identify non-random variation patterns to improve dimensional quality in automotive assembly process is presented. The proposed pattern recognition algorithm that integrates with the process knowledge basis is designed not only to detect variation patterns, but also to address the identification of unacceptable variation manifested by non-random patterns on the control chart. Once any non-random patterns occur on the control chart, the root causes of dimensional variations can be located systematically by investigating each possible cause based on the knowledge of the assembly process. This information will help to make process modifications that reduce dimensional variability for automotive body assembly process in real time. Therefore, it can be expected that the control chart with the proposed pattern recognition algorithm will play a more important role as a systematic diagnosis tool rather than only as a statistical monitoring tool.