1 July 2016 in Building and Environment
1 September 2018 in Building and Environment
20 December 2018 in Construction Management and Economics
Building Information Modelling (BIM) is said to hold potential for increasing efficiency of the design processes in the building industry. However, designers struggle at times to apply the different BIM-tools. In order to understand this disjoint, it is necessary to understand first the existing practices of different specialists in the building design process in order to improve future development and implementation of BIM. The aim of this article is to investigate the consequences of using BIM-tools in a collaborative building design setting consisting of different specialists. A case study was carried out to trace when BIM-tools were used (or not) in an inter-organizational design process of a naval rescue station in Denmark. The design process was holistically examined through the lens of Activity Theory which is an analytical framework. Five key findings were identified: the mediating role of 3D visuals, real-world coupling with point cloud, rule-breaking to ensure design completion, inability to integrate BIM-analysis into the design and the use of heuristics to form and choose among design solutions.
26 September 2023 in Journal of Building Engineering
1 March 2019 in International Journal of Construction Management
Renovating our existing building stock holds a great potential. However, as the complexity of renovation projects is high, multi-criteria decision-making methods can support the decision makers throughout the renovation process. This study explores two value-based decision-making methods: the analytic hierarchy process (AHP) and weighting, rating and calculating (WRC), in how they support decision makers in weighting criteria in the pre-design stage of building renovation projects. Participants from a Danish municipality were given the task of applying AHP and WRC to prioritize a set of renovation criteria. Four themes were analyzed: (1) practical applicability and decision transparency, (2) reflection and learning, (3) satisfaction with the final decision and (4) comparison to the original decision process. The results indicate that applying a formal weighting method in the pre-design stage of renovation projects increases the reflection, learning, transparency and satisfaction with the group decision outcome among the participants.
1 November 2020 in IOP Conference Series: Earth and Environmental Science
The building sector holds great potential and responsibility in achieving several of the United Nations’ sustainable development goals (SDGs). This study presents preliminary findings of an exploratory study aiming at investigating how the SDGs can be successfully implemented in construction projects in a Danish context. A focus group workshop was held with academic experts within building design and the SDGs. The participants discussed which aspects were important throughout the different phases of new construction projects for successful implementation of the SDGs, and the roles of the included actors. The results showed that the participants highlighted SDG 4 (quality education) and SDG 17 (partnerships for achieving the goals) as the most important throughout the different phases, from the programming phase to demolition or renovation. SDG 3 (health and well-being), was seen as the most important factor during the occupation phase, and the main positive effect of a successful design process. A “phase zero” was proposed to ensure a common ground and understanding the SDGs among the involved actors before the programming phase. Several barriers for implementing the SDGs in Danish building projects were identified in the study, including the need for local indicators, transfer of knowledge between the involved actors, and lack of user involvement. The results indicate that there is a need for rethinking and supporting strong partnerships among the different actors, improve knowledge management, and ensure targeted educational material regarding the SDGs towards all actors involved in the building process, including the building owner, advisors, craftsmen and users.