To ensure the safe and stable operation of the power grid, it is necessary to carry out the risk assessment of the main electrical connection in the substation. In traditional methods, the influences of the regional power grid on the main electrical connection scheme are ignored. This paper aims to propose a new method of main electrical connection risk assessment considering the regional grid safety constraints. Firstly, the traditional risk indexes are modified by considering the load shedding in the regional grid, and safety constraints indexes are built by using severity functions. Secondly, the analytic method is adopted to analyze the faults in the substation and determine the consequences, and the external equivalent of the substation is conducted. Finally, the regional grid’s power flow and optimal scheduling are calculated, and the risk assessment results are obtained. To verify the effectiveness of the proposed method, the IEEE-RTBS system and a real 220kV substation and its adjacent grid are taken for analysis. The results show that compared with the traditional method, the risk indexes obtained by the proposed method are more conservative, and the weakness of the main electrical connection under maintenance conditions can be obtained, which proves the proposed method’s feasibility and effectiveness.
Risk assessment can obtain the risk and economic indicators of power grid, and it plays an important role on power grid planning and decision-making. Traditional load planning rarely considered the impacts of different types of load’s access locations in the system from the perspective of operating risk. Therefore, this paper improved the traditional load shedding model in power grid risk assessment: Firstly, Take into account the impacts of load types on the load shedding strategy. Then, by traversing the accessible nodes and calculating the change of risk indicators under each access scheme, a planning method of optimal accessed point of load based on the results of power grid risk assessment is proposed. The results of the IEEE-RBTS test system showed that the method could obtain the optimal connecting nodes scheme with the least impact on the system risk and economic indicators effectively.
With the consideration of practical application, an index system of evaluation based on the standard and regulation for dry-type transformer is proposed. According to the characteristics of index system, the fuzzy matrix on indicator evaluation and the remark set could be established. Meanwhile, the weight based on experts` remark and the comprehensive fuzzy evaluation matrix abiding by layered theory could be constructed. Then, the mathematic model of operating evaluation for dry-type transformer could be established. Furthermore, the result could be tackled by the fuzzy method of distribution, and the fuzzy analytic hierarchy process adapted to the evaluation of dry-type transformer operation is proposed. As is demonstrated by the engineering project , the method is practical and the result obtained by the method is of great feasibility and comprehensive. Therefore, the method has a great reference value for the construction of maintenance plan.