9 January 2019 in IEEE Transactions on Smart Grid
This paper proposes an efficient planning algorithm for allocating smart electric vehicle (EV) charging stations in remote communities. The planning problem jointly allocates and sizes a set of distributed generators (DGs) along with the EV charging stations to balance the supply with the total demand of regular loads and EV charging. The planning algorithm specifies optimal locations and sizes of the EV charging stations and DG units that minimize two conflicting objectives: 1) deployment and operation costs and 2) associated green house gas emissions, while satisfying the microgrid technical constraints. This is achieved by iteratively solving a multi-objective mixed integer non-linear program. An outer sub-problem determines the locations and sizes of the DG units and charging stations using a non-dominated sorting genetic algorithm. Given the allocation and sizing decisions, an inner sub-problem ensures smart, reliable, and eco-friendly operation of the microgrid by solving a non-linear scheduling problem. The proposed algorithm results in a Pareto frontier that captures the tradeoff between the conflicting planning objectives. Simulation studies investigate the performance of the proposed planning algorithm in order to obtain a compromise planning solution.
2 May 2018 in IEEE Transactions on Sustainable Energy
This paper presents an efficient planning algorithm for microgrids in remote isolated communities. Different from the existing research that assumes a specific microgrid topology, we propose a planning algorithm that jointly specifies the optimal grid topology, namely AC, DC, or hybrid AC/DC, along with the optimal locations and sizes of distributed energy resources, energy storage systems, and AC/DC converters. The planning objective is to ensure reliable power flow with minimum deployment and operational costs. The planning problem is formulated as a mixed integer non-linear program, and given the complexity of the problem, the proposed algorithm implements a two-stage framework that results in an efficient planning solution. The first stage deals with the specification of the microgrid topology, and allocation and sizing of all the equipment following a heuristic optimization approach. Upon deciding the microgrid topology and equipment installation in the first stage, the second stage of the planning algorithm ensures smooth and reliable operation for the proposed topology over all possible operation scenarios. This is achieved with minimal operational costs by considering the optimal non-linear scheduling problem for the installed equipment. Test cases are presented to investigate the performance of the proposed planning algorithm at different fuel transportation cost scenarios.
11 September 2022 in Electric Power Systems Research