10 January 2018 in IEEE Transactions on Sustainable Energy
The large scale introduction of variable and limitedly predictable renewables requires flexible power system operation, enabled by, i.a., dynamic power plant operation, storage, demand response and enhanced interconnections. The fast start-up capabilities of combined-cycle gas turbines (CCGTs) are crucial in this regard. However, these non-standard operating conditions significantly reduce the lifetime of critical turbine components, as reflected in long-term service agreements (LTSAs). This should also be reflected in short-term scheduling models. In light of this challenge, we apply a unit commitment model that allows multiple start-up loading modes while accounting for the corresponding turbine maintenance costs based on LTSAs. Leveraging this model, we investigated the need for fast start-up capabilities of a set of CCGTs as part of a small scale test system considering various shares of renewables and dynamic reserve requirements. We have found that fast starts are often cost-optimal despite their greater turbine maintenance costs and a cost reduction of around 1 % is obtained when considering more costly fast start-up modes when scheduling. Furthermore, cost-optimal reserve sizing is a function of the planning frequency and is reduced by fast starting capabilities. We conclude that taking advantage of fast start-up capabilities benefits the electricity generation system and yields a significant cost reduction.
1 October 2018 in Energy Policy