Seyed Ali Hosseini

Seyed Ali Hosseini

Auto-generated profile, based on publicly available information

Seyed Ali Hosseini

Department of Electrical Engineering, Gonabad Branch , Islamic Azad University , Gonabad , Iran

Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
6 September 2024 in Heliyon
Verified
Journal Article
Open access
HSHassan Yaghubi Shahri
Hassan Yaghubi Shahri
SHSeyed Ali Hosseini
Seyed Ali Hosseini
JPJavad Pourhossein
Javad Pourhossein
Reducing thermal unit operating costs and emissions is the goal of the multi-objective issue known as multi-area economic/emission dispatch (MAEED) in smart grids. Using renewable energy (RE) have significantly lowered greenhouse gas emissions and ensured the sustainability of the environment. With regard to constraints such as prohibited operating zones (POZs), valve point effect (VPE), transmission losses in the network, ramp restrictions, tie-line capacity, this study aims to minimize operating costs and emission objectives by solving the multi-area dynamic economic/emission dispatch (MADEED) problem in the presence of RE units and energy storage (ES) systems. The conventional economic dispatch (ED) optimization approach has the following shortcomings: It is only designed to solve the single-objective optimization problem with a cost objective, in addition, it also does not have high calculation accuracy and speed. Therefore, to address this multi-objective MADEED problem with non-linear constraints, this paper introduces hybrid particle swarm optimization (PSO)-whale optimization algorithms (WOA). The reason for combining two algorithms is to use the advantages of both algorithms in solving the desired optimization problem. The introduced method is tested in two separate scenarios on a test network of 10 generators. Using the suggested hybrid methodology in this study, the MADED and MADEED problems are resolved and contrasted with other evolutionary techniques, such as original WOA, and PSO methods. Examining the results of the proposed method shows the efficiency and better performance of the proposed method compared to other methods. Finally, the results obtained by simulations indicate that integrating the necessary system restrictions gives the system legitimacy and produces dependable output. With regard to the results obtained from the introduced approach, the value of the overall cost function has clearly decreased by about 3 % compared to other methods.

20 September 2017 in IET Generation, Transmission & Distribution
Verified
Journal Article
Open access
PDF file
SHSeyed Ali Hosseini
Seyed Ali Hosseini
JSJavad Sadeh
Javad Sadeh
BMBabak Mozafari
Babak Mozafari
In this study, a wide‐area fault‐location (FL) method for power transmission lines is proposed. Impractical installation of modern measuring devices (e.g. phasor measurement unit (PMU)) throughout all network buses, due to lack of telecommunication infrastructures or funds, has imposed problems and a growing concern toward the wide‐area FL problem with a limited number of measurement devices. In the most related researches, the optimal PMU placement problem for the FL and state estimation issues is separately studied. Also, the existence of occasional gross errors in the measurement set, due to cyber‐attacks and various telemetry noise or failure, can bring about the wrong results for the FL algorithms. In the presented study, a PMU placement scheme is proposed for achieving both state and FL observability. Furthermore, by utilising this scheme, a new FL algorithm capable of contemplating gross measurement errors has been proposed. Faulted lines have purposely assumed unknown. In addition, by employing the voltages positive‐sequence components, results have shown immunity in regards to fault type and resistance. Comprehensive numerical simulations on the IEEE 14‐bus, 57‐bus and 118‐bus test systems have demonstrated the effectiveness of the proposed method and provided proof to this claim.

17 August 2026 in International Journal of Emerging Electric Power Systems
Verified
Journal Article
Closed access
ASAli Solati
Ali Solati
ASAli Asghar Shojaei
Ali Asghar Shojaei
SSSepehr Soltani
Sepehr Soltani
SHSeyed Ali Hosseini
Seyed Ali Hosseini
Every year, the load growth in distribution networks causes various challenges such as voltage drop. Since some of these challenges are due to the lack of reactive power sources, these problems can be solved by installing reactive power resources such as capacitors. On the other hand, considering that the installation of capacitors in the network based on one or more hours of the study period (due to the impracticality of carrying out load flow studies in all the hours of the multi-year study period) caused to over investment in capacitors and becomes uneconomical, a solution should be provided in order to optimally allocate these resources based on all the hours of the multi-year study period. Therefore, in order to solve the problem raised and in order to rationally allocate reactive power compensation devices in distribution networks, a method based on fuzzy logic is developed in this paper to take into account the amount of network load in all hours of the study period and at the same time the execution of simulations be very short in order to solve such problems. Hence, in this paper, as the first contribution, the considered problem has been solved using the method based on standard fuzzy logic, taking into account all the hours of the study period, and then as the second contribution, the optimization of the parameters of the fuzzy membership functions has been discussed, and the proposed method has been upgraded. The simulation results showed that the developed method has sufficient efficiency and it can be used to optimally allocate capacitors in the network by considering all the hours of the study period. Also, the developed method was able to improve the objective functions to a greater extent by optimally setting the parameters of the fuzzy membership functions. Optimizing the parameters of the fuzzy membership functions made the objective function of the total costs to be improved by 0.8, 1.9 and 2.5 percent by installing one, two and three capacitors, respectively. Also, this optimization caused the objective function of voltage profile to improve by 0.4, 0.7, and 1.2 percent, respectively, by installing one, two, and three capacitors.

1 January 2026 in International Transactions on Electrical Energy Systems
Verified
Journal Article
Open access
PDF file
RGRahman Abasszadeh Gorany
Rahman Abasszadeh Gorany
SHSeyed Ali Hosseini
Seyed Ali Hosseini
JPJavad Pourhossein
Javad Pourhossein
This paper addresses the problem of secondary voltage and frequency control in islanded AC microgrids under uncertain operating conditions and limited system modeling information. Conventional secondary controllers typically rely on accurate mathematical models and centralized communication structures, which reduce flexibility and robustness in practical applications. To overcome these limitations, a distributed model‐free adaptive control (MFAC) strategy is proposed for a four‐unit islanded AC microgrid. The proposed approach regulates voltage and frequency using only real‐time local input–output measurements without requiring an explicit mathematical model of the microgrid. The controller employs online dynamic linearization and pseudogradient estimation to adapt to parameter uncertainties, load variations, and communication delays in real time. In addition, each distributed generation (DG) unit computes its control action using only local and neighboring information, improving scalability and reducing dependence on centralized coordination.