Pierre Schnizer

Pierre Schnizer

Auto-generated profile, based on publicly available information

Pierre Schnizer

GSI Helmholtzzentrum für Schwerionenforschung GmbH, Darmstadt, Germany

Research Focus & Metrics

Academic Career Length

16Years (2011-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
22 November 2011 in IEEE Transactions on Applied Superconductivity
Verified
Journal Article
Closed access
PSPierre Schnizer
Pierre Schnizer
BSBernhard Schnizer
Bernhard Schnizer
PAPavel Akishin
Pavel Akishin
AMAnna Mierau
Anna Mierau
EFEgbert Fischer
Egbert Fischer
SIS100 is the world's second fast ramped synchrotron using superconducting magnets. The foreseen high current operation requires a sound understanding of the field homogeneity next to a field parametrization which allows investigating if the existing inhomogeneity introduces transverse oscillations on the particle beam. The SIS100 dipole magnets are curved so local toroidal multipoles were developed as these follow the orbit of the ion beam. The end of the magnet creates the main field deterioration due to the coil end shape which has to be compensated by a 3D end shim. In this paper we present the Local Toroidal Multipoles next to formulae to derive these from rotating coil probe measurements. Further we outline the possible geometrical options for meeting the field quality target.

1 January 2015 in Physics Procedia
Verified
Journal Article
Open access
ABA. Bleile
A. Bleile
EFE. Fischer
E. Fischer
WFW. Freisleben
W. Freisleben
AMA. Mierau
A. Mierau
PSP. Schnizer
P. Schnizer
PSP. Szwangruber
P. Szwangruber

20 August 2013 in IEEE Transactions on Applied Superconductivity
Verified
Journal Article
Closed access
PDF file
KSKei Sugita
Kei Sugita
PSPierre Schnizer
Pierre Schnizer
JMJan Patrick Meier
Jan Patrick Meier
ABAlexander Bleile
Alexander Bleile
AMAnna Mierau
Anna Mierau
EFEgbert Fischer
Egbert Fischer
GSI plans to build a test string in the Series Test Facility (STF) for SIS100 at GSI. The SIS100 cryomagnetic modules and local cryocomponents will be assembled and intensively tested. The purpose of the string test is to confirm technical systems of cryogenic, vacuum, interlock and quench protection, and powering under normal and extreme conditions. Acquirement of knowledge through experiences in test string construction, commissioning, and testing is crucial for the SIS100 construction and operation. We present the planning and preparation status of the string test.

29 October 2014 in arXiv
Verified
Preprint
Open access
PDF file
PSPierre Schnizer
Pierre Schnizer
EFEgbert Fischer
Egbert Fischer
BSBernhard Schnizer
Bernhard Schnizer
Recent progress in particle accelerator tracking has shown that the field representation is one of the major limits of the prediction accuracy especially for machines, whose aperture is fully filled by the beam and thus higher the artefacts created by higher order modes have to be thoroughly understood. The standard tool for field presentation today are cylindrical circular multipoles due to their straight forward correspondence to the Cartesian coordinates. In this paper we extend the standard approach to other coordinate systems, show how these can be measured next to their realisation in measuring the SIS100 Magnets for the FAIR project.