Fernando Lopez-Irarragorri

Fernando Lopez-Irarragorri

Auto-generated profile, based on publicly available information

Fernando Lopez-Irarragorri

Universidad Autónoma de Nuevo León, Pedro de Alba S/N, Niños Héroes, Ciudad Universitaria, San Nicolás de los Garza, Nuevo León 66455, Mexico

Research Focus & Metrics

Academic Career Length

13Years (2014-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
27 December 2021 in Mathematical Problems in Engineering
Verified
Journal Article
Open access
PDF file
NMNancy M. Arratia Martinez
Nancy M. Arratia Martinez
NHNelly Monserrat Hernandez-Gonzalez
Nelly Monserrat Hernandez-Gonzalez
FLFernando Lopez-Irarragorri
Fernando Lopez-Irarragorri
A project portfolio can be defined as a set of project proposals that are selected according to one or more criteria by a decision-maker (individual or group). Regularly, the portfolio selection involves different decision problems, among those evaluation, selection, scheduling, and resource allocation. In published scientific literature, these problems have been addressed mainly separately giving as a result suboptimal solutions (portfolios). In addition, elements as partial allocation and project representation through tasks constitute relevant characteristics in practice that remain unaddressed in depth. The proposal of this research is to integrate the project selection and project scheduling, incorporating all relevant elements of both decision problems through the scheduling of tasks allowing to determine when the task will be funded and executed. The main impact of precedence rules at the task level in the portfolio is also studied. In this work, Project Portfolio Selection and Scheduling Problem (PPSS) is studied and solved through a new mixed-integer linear programming (MILP) model. The model incorporates renewable and nonrenewable resource allocation, along with partial and total funding policies, project divisibility, and interdependences. Scheduling is integrated into the model, both at the project level and at the project task level, which allows scheduling in noncontiguous periods. Small instances (up to 64 projects) and medium instances (up to 128 projects) were solved optimally in very short times. The relationship between the quality of near-optimal solutions and the solution computing time by modifying the parameters of the solver employed was researched. No significant change in the solution’s quality was perceived, but a significant reduction in solution computing time was achieved. Furthermore, the main effects of precedence rules on solution times and portfolio impact were studied. Results show that even if few precedence rules were introduced, the resource allocation of tasks changed significantly, even though the portfolio impact or the number of projects of the selected portfolios remains the same.

1 August 2014 in Journal of Applied Research and Technology
Verified
Journal Article
Open access
AÁA. Álvarez-Socarrás
A. Álvarez-Socarrás
ABA. Báez-Olvera
A. Báez-Olvera
FLF. López-Irarragorri
F. López-Irarragorri
Nowadays, Supply Chain success and competitiveness heavily depend on the integration of its components and adaptability to deal with a changing environment. This article suggests the integration of design and management of a Supply Chain from an outcome-driven perspective. We propose a two-phase decision-making support methodology: first suppliers are pre-screened by solving a multi criteria sorting problem, and then a design and management plan is generated by solving a Mixed Integer Linear Programming Model. Experimentally we showed that the proposed methodology can efficiently solve to optimality the most popular benchmark instances published in previous paper moreover our model also includes problem characteristics that have not been addressed together in previous published papers