Endika Bilbao

Endika Bilbao

Auto-generated profile, based on publicly available information

Endika Bilbao

Research and Development Dubai Electricity and Water Authority Dubai United Arab Emirates

Research Focus & Metrics

Academic Career Length

18Years (2009-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
4 June 2012 in IEEE Transactions on Industrial Electronics
Verified
Journal Article
Closed access
HBHector Beltran
Hector Beltran
EBEndika Bilbao
Endika Bilbao
EBEnrique Belenguer
Enrique Belenguer
IEIon Etxeberria-Otadui
Ion Etxeberria-Otadui
Pedro RodriguezPedro Rodriguez
Pedro Rodriguez
This paper analyzes the minimum energy capacity ratings that an energy-storage (ES) system should accomplish in order to achieve a defined constant power production in a photovoltaic (PV) power plant. ES is a key issue for the further integration of intermittent and stochastic renewable energy sources, which are not currently dispatchable due to their dependence on real-time weather conditions, as is the case of PV technology. This paper proposes and describes an energy management strategy (EMS) for operating PV power plants with ES in the future. The goal of this EMS is to endow these power plants with a constant production that can be controlled and hence traded on electricity markets. This paper presents simulated results on the percentage of time throughout the year during which a large-scale PV+ES plant operates properly with different ES ratings and according to different configurations of this EMS. Finally, a test bench was developed, and experimental results validating this EMS were obtained.

2 August 2013 in IEEE Transactions on Industry Applications
Verified
Journal Article
Closed access
EBEndika Bilbao
Endika Bilbao
PBPhilippe Barrade
Philippe Barrade
IEIon Etxeberria-Otadui
Ion Etxeberria-Otadui
Alfred RuferAlfred Rufer
Alfred Rufer
SLSergio Luri
Sergio Luri
IGInigo Gil
Inigo Gil
Efficiency and energy consumption reduction are becoming a key issue in elevation applications. Energy Storage Systems (ESS) can play a significant role in this field, together with their associated Energy Management Strategy (EMS) to optimize the overall behavior of the elevator. This paper presents an EMS based on Dynamic Programming (DP) for a stochastic application where the cost function is based on the stock management theory. For that purpose, an implementation methodology for DP-based EMS is also proposed. That methodology has been applied on an elevator where the system modeling has been carried out. Due to the stochastic behavior of the application, a novel representation method is also presented (General Energy and Statistical Description). The EMS has been implemented and validated experimentally on a real elevator with energy storage capability reducing grid power peaks by 65% and braking resistor energy losses up to 84%.

1 June 2009
Verified
Conference Paper
Open access
AMAitor Milo
Aitor Milo
HGHaizea Gaztanaga
Haizea Gaztanaga
IEIon Etxeberria-Otadui
Ion Etxeberria-Otadui
EBEndika Bilbao
Endika Bilbao
Pedro RodriguezPedro Rodriguez
Pedro Rodriguez
In this paper a hybrid microgrid system, composed of RES (Renewable Energy System) and CHP (Combined Heat and Power) systems together with a battery based storage system is presented. The microgrid is accompanied by a centralized energy management system (CEMS) in order to optimize the microgrid operation both in grid-connected and in stand-alone modes. In grid-connected mode the optimization of the economic exploitation of the microgrid is privileged by applying optimization techniques. In stand-alone mode, management functions are applied to improve the reliability of the facility by means of islanding operation capability. The optimization analysis has been carried out in simulation while the reliability improvement of the microgrid operation has been analyzed in simulation and proven experimentally.

1 September 2010
Verified
Conference Paper
Closed access
SLSergio Luri
Sergio Luri
IEIon Etxeberria-Otadui
Ion Etxeberria-Otadui
ARAlejandro Rujas
Alejandro Rujas
EBEndika Bilbao
Endika Bilbao
AGAntonio Gonzalez
Antonio Gonzalez
This paper presents the design and development process of a supercapacitor storage based elevator. The main design aspects of the storage system are described: the storage system rating and the DC/DC converter design. Based on this design procedure, a supercapacitor based Energy Storage System has been developed based on a multichannel buck-boost converter. Comparing with a conventional elevation system, the designed device is able to achieve an improved efficiency, reducing grid-absorbed power and guaranteeing automatic rescue. A 5 kW prototype has been developed and tested first in simulation and then experimentally, both in laboratory and in a real elevator, validating the energy storage system design and its different operation modes.

4 June 2022 in The Journal of Engineering
Verified
Journal Article
Open access
AMAshot Mnatsakanyan
Ashot Mnatsakanyan
HAHamad Albeshr
Hamad Albeshr
AAAli Almarzooqi
Ali Almarzooqi
CIChristos Iraklis
Christos Iraklis
EBEndika Bilbao
Endika Bilbao
Large penetration of various types of distributed energy resources and new requirements in electricity markets, have facilitated creation of sophisticated distributed energy resource aggregation systems for providing grid services. Aggregators such as Virtual Power Plants enable participation of small‐ and medium‐scale distributed energy resources in electricity markets, interacting with grid operators to collectively provide ancillary power and energy services. These interactions between grid operator, Virtual Power Plants operator and distributed energy resources are complex both in terms of contractual agreements and provision of services. On all layers, accurate tracking of distributed energy resource usage and execution of contracts is required for establishing trust between transacting participants. Digitalisation and automation of processes such as control of distributed energy resources, verification and payouts for services will add value for solving complexity of dealing with multiple parties in a Virtual Power Plants aggregation model. The authors present a blockchain‐integrated Virtual Power Plants system that enables full automation of distributed energy resource controls through smart contracts, digital trust between participants and immediate payouts for services. Effectiveness of the developed blockchain mechanism is demonstrated on a pilot Virtual Power Plants system comprising distributed energy storage systems, renewables, EV charging stations and loads with a total size of 1.8 MWs. Additionally, we propose a new mechanism for managing renewable energy curtailments through blockchain.

1 September 2012
Verified
Conference Paper
Closed access
EBEndika Bilbao
Endika Bilbao
PBPhilippe Barrade
Philippe Barrade
IEIon Etxeberria-Otadui
Ion Etxeberria-Otadui
Alfred RuferAlfred Rufer
Alfred Rufer
SLSergio Luri
Sergio Luri
IGInigo Gil
Inigo Gil
Efficiency and energy consumption reduction are becoming a key issue in elevation applications. Energy Storage Systems (ESS) can play a significant role on this field, together with their associated Energy Management System (EMS) in order to optimize the overall behavior of the elevator. This paper presents an EMS based on Dynamic Programming (DP) for a stochastic application, introducing a novel representation of these systems (General Energy and Statistical Description) and implementing a cost function based on the stock management theory. It has been implemented and validated experimentally on a real elevator with energy storage capability reducing grid power peaks by 65% and braking resistor energy losses up to 84%.