Zhenyuan Li

Zhenyuan Li

Auto-generated profile, based on publicly available information

Zhenyuan Li

College of Control Science and Engineering, China University of Petroleum (East China), Qingdao 266580, People’s Republic of China

Research Focus & Metrics

Academic Career Length

6Years (2021-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 December 2021 in Industrial Crops and Products
Verified
Journal Article
Closed access
BLboye liu
boye liu
ZLZhenyuan Li
Zhenyuan Li
JZJingsi Zhang
Jingsi Zhang
MDMei Du
Mei Du
FFFang Fang
Fang Fang
FCFu-Sheng Chen
Fu-Sheng Chen

28 February 2024 in Measurement Science and Technology
Verified
Journal Article
Closed access
PDF file
ZLZhenyuan Li
Zhenyuan Li
YGYanfeng Geng
Yanfeng Geng
YYYisen Yang
Yisen Yang
WWWeiliang Wang
Weiliang Wang
SHShuaishuai Hang
Shuaishuai Hang
The geomagnetic components measurement directly influences the azimuth and magnetic Toolface of downhole drilling tools. Accurate estimation of the geomagnetic components is crucial for wellbore trajectory control. However, the unknown magnetic interferences caused by ferromagnetic drilling tools introduce significant errors in the estimation of the geomagnetic components. Firstly, this paper considers the constraint of a constant total magnetic field value and introduces the unknown axial interferences of the drilling tools as a new state. At the same time, parameter uncertainties and radial interferences within the drilling tools are regarded as unknown but bounded, leading to the establishment of a linear time-varying system model for the measurement system. Then, a state estimation method based on the Zonotopic Kalman filter (ZKF) is proposed for geomagnetic components and attitude measurements. The simulation results indicate that, compared to the ZKF method without considering nonlinear constraints, the method proposed in this paper effectively separates the axial interference of the geomagnetic components from the drilling tools during dynamic measurements. The root mean square errors of the estimated three-axis geomagnetic components are reduced to 0.0249 Gauss, 0.0082 Gauss, and 0.0148 Gauss, resulting in improvements in accuracy of 96.06%, 28.6%, and 14.1%, respectively. Furthermore, the root mean square errors of the gravity Toolface, magnetic Toolface, and azimuth estimation decreased to 1.8296°, 1.8294°, and 3.2898°, leading to enhancements in accuracy of 9.61%, 9.71%, and 96.37%, respectively. Finally, experimental validation confirms the effectiveness of the proposed method, providing a reference basis for dynamic measurement while drilling.

29 April 2023
Verified
Conference Paper
Closed access
PDF file
ZLZhenyuan Li
Zhenyuan Li
GRGuo Ru
Guo Ru
PSPeng Sheng
Peng Sheng
Isonicotinic acid is used as a pharmaceutical intermediate, mainly for the production of the anti-tuberculosis drug isoniazid. Prediction of isonicotinic acid yield using data from the production process is helpful to ensure product quality and improve production efficiency. Traditional BP neural networks have lots of disadvantages such as slow convergence, easy to fall into local minima and sensitive to the selection of initial weights and thresholds. In order to predict isonicotinic acid yield efficiently and accurately, a prediction model of isonicotinic acid yield based on the Grey Wolf Optimizer (GWO) optimized BP (GWO-BP) neural network was proposed. The prediction model was used to predict the historical production data of isonicotinic acid in a plant, and the experimental results showed that the accuracy of the proposed GWO-BP prediction model was higher compared with the traditional BP and GA-BP prediction models.

19 May 2021 in E3S Web of Conferences
Verified
Conference Paper
Open access
PDF file
YSyong sun
yong sun
ZLZhenyuan Li
Zhenyuan Li
CSChaoyu Shi
Chaoyu Shi
BLBaoju Li
Baoju Li
MYMao Yang
Mao Yang
The short-term probabilistic prediction of wind power has the characteristics of spatial dependence and time-series dependence. Considering the two characteristics at the same time can improve the prediction level. In this paper, a probabilistic short-term wind power prediction model considering the temporal and spatial dependence of prediction error is proposed. Considering the coupling relationship between the two properties, the NWP(Numerical Weather Prediction) wind speed point prediction error in the historical period is hierarchical clustering, and the empirical distribution model is used to fit the probability distribution of the error under different wind conditions; the cumulative empirical distribution probability value corresponding to the NWP wind speed at the time to be predicted is bootstrap sampling; under the given confidence level, the possible wind speed at each time point to be predicted in the short term is calculated The power fluctuation range of the generator. The test results show that this method can ensure the statistical significance and fitting stability of the sub sample set at the same time, and improve the classification accuracy of the days to be predicted. Compared with considering a single property, the result of probability prediction performs better on multiple evaluation indexes.